The village has built its own brick and concrete house, built for seven years, and the living room i

Updated on Living room 2024-08-02
1 answers
  1. Anonymous users2024-01-24

    It has been built for seven years, and the living room is only wide and deep in the middle.

Related questions
2 answers2024-08-02

Rural people have never gone through design verification to build houses, and all national standards and design specifications are useless in rural people's house construction; >>>More

2 answers2024-08-02

12 walls, not a big problem, no need to remedy or something.

3 answers2024-08-02

For such a big thing, how much steel bar is needed and what is the spacing, the designer should calculate according to the self-weight of the house and the external load. I have never been engaged in design, but in construction and budgeting, and I have never seen a floor slab with a diameter of 6 steel bars. The minimum is also 8. Be careful.

1 answers2024-08-02

It is not recommended to apply tiles immediately, and wait for the kitchen wall to dry before pasting.

2 answers2024-08-02

It is best to design well in advance, because the kitchen and toilet need to have water supply and water, and the pipes should be well grounded.