-
Just punch holes in the wall at the head of the bed and install it. Don't still pay attention to the location of the installation.
The gypsum line can be connected and leveled with quick-adhesive powder and gypsum, and finally sanded with sandpaper. >>>More
3. Find an environmental management company to deal with it. >>>More
There will be sticky glue, so it will be washed off.
Do waterproofing needs to be done on the surface of the water, dig excellent permeability crystalline waterproofing, you can do it yourself on the cement surface with a super permeable waterproof guard (if there are cracks and potholes on the cement surface, fill the complete with metin porcelain glue and then do waterproofing). >>>More
A larger Chinese knot hangs at the head of the bed.