How to do the waterproof construction of the kitchen bathroom

Updated on Kitchen 2024-07-31
2 answers
  1. Anonymous users2024-01-24

    1. Kitchen and bathroom floor.

    When renovating the kitchen and bathroom floor, the waterproofing layer is the most easily damaged. Therefore, when rebuilding, we should try to protect the original waterproof layer, and once damaged, we should repair it in time and redo the waterproof layer.

    Second, it is adjacent to the wall with the bathroom equipment.

    You must know that when we usually wash, water will splash on the adjacent wall, if there is no waterproof protection, the wall is prone to dampness and mildew. Therefore, before laying the front tiles, be sure to do a good job of waterproofing the wall. Non-heavy and lightweight walls, at least to be meters high, preferably the entire wall waterproof.

    The waterproofing of the wall adjacent to the shower location should also be at the same height, and the height of the wall waterproofing coating adjacent to the bathtub should also be higher than the upper edge of the bathtub.

    3. The joints between the wall and the ground, the water pipes and the ground.

    Everyone should know that leakage generally occurs in the pipe roots, floor drains, sanitary ware and yin and yang corners that pass through the floor, which is caused by loose pipe roots, floor drains and other parts, poor bonding, poor painting or local damage to the waterproof layer, and these edges and corners are the most prone to leakage, so the joints between the wall and the ground, the upper and lower water pipes and the ground should also be waterproof.

    Fourth, the wall of the buried water pipe.

    When burying the water pipe in the wall, it should be made a groove larger than the pipe warp, and the plastering in the groove should be smooth, and then the waterproof paint should be brushed in the groove for waterproof treatment.

    5. Sewage outlets and floor drains.

    The floor of the kitchen and bathroom must be sloped to the floor drain opening, so that the drainage is smooth and there will be no water accumulation. At this time, the waterproof material of the bathroom is particularly important, and we should try to avoid changing the original drainage and sewage pipes and floor drain locations when decorating.

  2. Anonymous users2024-01-23

    Clause. First, before doing waterproofing, the base surface should be inspected, and if uneven positions are found, they should be repaired in time, and if there are cracks, they should be dealt with in time.

    Clause. Second, when the base surface is treated, it is necessary to ensure that there is no dust on the base layer, and some particles on it also need to be removed, and there can be no open water on the base surface.

    Clause. 3. When mixing the waterproof slurry, it is necessary to mix the strong waterproof slurry with the powder, and stir it until it is uniform and free of granules before it can be used.

    Clause. 4. In addition, in the process of applying waterproof slurry, it is necessary to strengthen the coating on the corners and deformed parts first, and then apply a wide range of ground applications.

Related questions
7 answers2024-07-31

Toilet waterproofing practices:

Basic material selection: new waterproof materials such as cement mortar, old ones such as acrylic are commonly used toilet waterproof materials. We should choose based on the principles of easy construction, environmental protection and good quality. >>>More

1 answers2024-07-31

The flow of construction:

1.Reinforcement of the original waterproof layer of the bathroom and the first water test. >>>More

3 answers2024-07-31

Toilet waterproofing practices:

Basic material selection: new waterproof materials such as cement mortar, old ones such as acrylic are commonly used toilet waterproof materials. We should choose based on the principles of easy construction, environmental protection and good quality. >>>More

1 answers2024-07-31

If you are the owner.

Tell the maintenance master the precautions in the construction area. >>>More

1 answers2024-07-31

That's right! We must not try to save trouble and cheap, if we do not do a good job, we will pay a greater price in the future. Generally, the leak plugging treasure is used to do the yin angle treatment, and then the ground is used with the brand of polyurethane waterproof coating, and then the closed water experiment is done. >>>More