    1. Material inspection (1) First of all, when designing the balcony, it is necessary to specify the provisions of the balcony railing, and when inspecting the railing, pay attention to whether the material, specification, quantity and burning performance level of wood and plastic used in the production and installation of balcony guardrails and handrails meet the design requirements. (2) Inspection method: when accepting the balcony, carefully observe the specifications and quantity of the balcony guardrail and handguards; Ask the construction party for the product qualification certificate, check whether the materials meet the design requirements, and avoid the construction personnel cutting corners or shoddy.

    2. Installation inspectionAfter ensuring that the materials used in the balcony railings and handrails are the materials specified in the design, the residents also need to check the installation of the balcony guardrails and handrails, including the shape, installation location, and installation hardware of the balcony guardrails and handrails. The details are as follows: (1) Before the installation of the balcony guardrail and handrail, the correct construction specification of the construction personnel is to locate the installation position of the balcony guardrail and handrail by drawing a line according to the design, and then install it.

    However, some unprofessional construction teams will make the balcony installation position not conform to the decoration design, resulting in inconvenience to the balcony guardrail and causing safety accidents. Residents can use rulers.

    You can tie a heavy object with a string, which can be stone or iron, to measure the verticality of the window frame. The verticality is measured to prevent the doors and windows from tilting, if the doors and windows are tilted 1 and the center of gravity is tilted, the doors and windows will affect the function, such as pushing and pulling. 2. The width of the upper and lower closures of the interior and exterior decoration is different.

    Thank you for your question.

    You're welcome, if Tutor Xiaoyang's answer is helpful to you, please give a thumbs up (comment in the lower left corner), look forward to your like, your efforts are very important to me, and your support is also the driving force for my progress. If you feel that my answer is still satisfactory, you can click on my avatar for one-on-one consultation. Finally, I wish you good health and a good mood!

Related questions
2 answers2024-07-18

Seal balcony acceptance standard 1, glass first to see whether the glass is translucent and tidy, no bubbles, no scratches, no obvious ripples from the side, the installed glass is especially important for the lighting of people with low floors. In addition, the frosted glass should be frosted with the side facing inward, and the frosted glass will become transparent when it sees water on rainy days. Seal the balcony acceptance standard 2, the frame is followed by see whether the window sash is smooth, in most cases it depends on whether the frame is horizontal and vertical, with a rectangular ruler or mineral water, to see whether it is on the same level as the water. >>>More

4 answers2024-07-18

1. National standards for fireproof and anti-theft doors. >>>More

3 answers2024-07-18

Haven't you signed any agreements? If you can't see anything from this hand-drawn drawing, and there is no frame at all, the design is unreasonable. You can go to court to sue the renovation company, and you can also check the relevant construction done by this company in the past, and if there is a problem, you can sue these householders together. >>>More

3 answers2024-07-18

There is no acceptance of the commercial building, and it is best not to seal the balcony first, because if you fail to pass the acceptance, it is very troublesome for you to seal the balcony.

4 answers2024-07-18

Toilet waterproof acceptance specification "1, control procedures of this project toilet parts using high elasticity water-retaining material construction, due to the many types of work in these parts, is the focus of waterproofing, so the following control procedures are adopted, the procedure is: installation, reserved holes, pipelines in place correctly civil engineering, plugging holes, irrigation experiments, leveling layers, waterproof layers, irrigation experiments, protective layers, irrigation experiments, the implementation of process handover acceptance card system. The table is as follows: >>>More