After the bathroom has been waterproofed, the ground appears to be frosty

Updated on Bathroom 2024-07-26
1 answers
  1. Anonymous users2024-01-24

    Professional waterproof for you to answer: what you said must be waterproof coating JS brush, this is because there is no uniform stirring before construction, which directly affects the waterproof effect, it is recommended to re-brush, must be mechanically stirred.

Related questions
1 answers2024-07-26

The reason why there are many cracks on the surface of the bathroom floor after waterproofing is generally the dry shrinkage cracks caused by excessive thickness during construction, especially the corners, pipe mouths and uneven base surfaces, these parts are the key parts of waterproof construction, and the construction personnel often carry out multiple brushing in the case of incomplete surface drying, resulting in excessive thickness of the coating film, and dry shrinkage cracks are caused by the difference in the cold shrinkage coefficient of the thermal barrier, which will lead to water seepage in serious cases. >>>More

8 answers2024-07-26

Bathroom water seepage depends on the cause of water seepage, if it is a non-water pipe leakage, that is, to eliminate the water pipe and sewer pipe leakage, that is, the tile surface, tile joints, joints around the ground and the water seepage around the root of the floor drain pipe are collectively referred to as tile surface seepage, the main reason for the water seepage on the tile surface is that the waterproof layer is done during the decoration, and the general waterproof layer problem is mainly from the root of the pipe to the downstairs water seepage, and there is a situation that the bathroom exterior wall is damp and peeling, black and moldy. Non-water pipe leakage can be repaired with Yijia waterproof three musketeer products, no need to plane bricks, directly on the surface of the tile maintenance, after the repair of the tile surface does not have any changes, the tile surface will not become slippery, nor will anything be formed. Walking on it or cleaning will not affect the waterproofing material. >>>More

2 answers2024-07-26

After you have carried out the hydropower transformation, the waterproof layer of the membrane made by the developer has basically been destroyed, so it is recommended that it is needed. >>>More

1 answers2024-07-26

The bathroom is waterproof, the standard practice is that the ground needs to be done all, and the wall should be at least meters, and it is recommended to do it full height. If it is a lightweight wall, then the wall must be made to full height. >>>More

2 answers2024-07-26

Under normal circumstances, changing water and electricity will inevitably damage the waterproofing, and some changes need to be through the wall and slotted. So after the transformation, I was finally doing a waterproofing.