    Bathroom waterproofing, first of all, do the leveling layer. Flatten the ground with cement mortar, and then waterproof. This avoids leakage caused by uneven thickness or puncture of the waterproofing membrane.

    Then apply waterproof paint, generally speaking, the shower area should be 180cm on the wall, 50-120cm in other areas, but now, it is generally 180cm. Moreover, the waterproof coating should be applied twice, and the cross coating method combining horizontal and vertical J is used to ensure that the paint is evenly applied and there will be no leakage.

    Finally, a closed water test should be done, and after the waterproof construction is completed, all the sewers in the toilet should be blocked and the water injection test should be carried out. After 24 hours, if there is no leakage on the walls and floors around the bathroom, it means that the waterproof quality of the bathroom is very good. On the contrary, it is necessary to find out the leakage point and carry out repairs.

    PS: If you plan to put the washing machine in the bathroom, you need to leave two floor drains, so that the shower and the washing machine do not conflict with each other. And after the basic water and electricity are done, don't forget to flush the floor drain pipe to prevent cement from splashing in, solidifying and clogging in case of water, and affecting future use.

Related questions
7 answers2024-07-11

Bathroom waterproofing practices What is it, how to do the bathroom waterproofing, how to do the bathroom waterproofing, these issues are more concerned about the owners. Tuba Rabbit will solve your doubts and introduce the practice of bathroom waterproofing. >>>More

1 answers2024-07-11

1. Clean the ground and apply waterproof paint three times. >>>More

2 answers2024-07-11

The ground is oriented to the slope of the floor drain, cement mortar or bean stone concrete can be used, but the surface should be flat. The slope near the door is small, and the slope near the floor drain is large, so you can grasp it according to the specific situation. The ground is uneven, and it may be uneven when applying waterproof coating, or the ground is easy to crack because of unevenness, which will crack with the ground even if the waterproof paint is applied. >>>More

8 answers2024-07-11

Toilet waterproofing practices:

Basic material selection: new waterproof materials such as cement mortar, old ones such as acrylic are commonly used toilet waterproof materials. We should choose based on the principles of easy construction, environmental protection and good quality. >>>More

2 answers2024-07-11

One-component and two-component waterproof coatings are not the same, one-component I don't know very well, let's talk about the two-component Chenguang waterproof coating construction process: 1. Base treatment: The surface of the base layer should be smooth, solid, clean, no sharp corners, no oil stains, no water and cracks. >>>More