The property was not notified during the renovation, and the wall of a bedroom and kitchen was remov

Updated on Kitchen 2024-07-11
2 answers
  1. Anonymous users2024-01-24

    Whether it is legal or not, you can first look at the "Decoration Management Contract" you signed with the property, there must be a clause on the construction according to the drawings, if the agreement is violated, what will be the treatment plan! This renovation management contract is legally beneficial!

    If the wall you demolish is the main structure wall, unless you have a drawing from the design institute to prove that it does not affect the theme structure, otherwise, it is 100% illegal!

  2. Anonymous users2024-01-23

    Changes to the main structure of the room must be notified to the property and cannot be altered if the load-bearing walls are made.

Related questions
2 answers2024-07-11

This is an external hemorrhoid, if it is convenient, go to a reliable anorectal hospital for surgical treatment.

4 answers2024-07-11

First of all, according to your description, we have to correct a few problems, first of all, the bedroom is separated from the bathroom is taboo, if the bedroom is big enough, it is OK, the way to deal with it is to make out the dry and wet separation area, and the bathroom door should be closed when not in use, otherwise the water vapor, damp breath will affect the human body, indoor feng shui is not allowed, so it is easy to make people sick, bacteria breed, the bedroom is the place where we rest can be said to be the most important place in the home, so if you can not do the bathroom in the bedroom, try not to do it!

3 answers2024-07-11

The color is the same, and it is more suitable to match.

3 answers2024-07-11

Within 300 square meters, there is a private room restaurant within 30-45 days, 100 square meters without a private room within 30 days, more than 1000 square meters of normal more than 2 months of construction period, the design is generally based on the hotel positioning high and low generally 1-3 days, 7-15 days, 15-45 days, if the restaurant in the square is generally normal for 1 month, because the restaurant decoration should also take into account the construction time and approval of fire protection, so the preliminary work should be done in place, the later speed will be fast, affecting the construction period of two points, a drawing is incomplete, The early design is not in place, the audit is difficult and there are too many changes in the later stage, and the second materials and personnel are not in place