Generally, the bathroom waterproofing should be done for a few days

Updated on Bathroom 2024-07-08
11 answers
  1. Anonymous users2024-01-24

    Generally, the waterproofing of the bathroom is about 3 to 5 days, because first of all, you have to coat the waterproof material in the bathroom, and after painting, you also have to put water on the coating of the bathroom to do the operation test of the leakage, and if there is no leakage, you can only laminate the floor tiles.

  2. Anonymous users2024-01-23

    After the bathroom waterproofing is done, a closed water test should be done, generally for four or five days.

  3. Anonymous users2024-01-22

    Generally, it takes 3-5 days to do it well, do it once a day, at least twice, and then close the water test for 24-48 hours

  4. Anonymous users2024-01-21

    Do it twice, irrigate it, and observe it for seven days

  5. Anonymous users2024-01-20

    It takes a total of 3-4 days to make the toilet waterproof, waterproof steps:

    1. Ground treatment.

    Before waterproofing, be sure to level the ground, if the ground is uneven, it may affect the effect of waterproofing, and may also cause cracking and leakage caused by uneven thickness of waterproof coating. Floor drains, wall corners, pipe heels and other joints should be painted with high elasticity and flexible waterproofing, because the joints between the wall and the floor of the bathroom will be displaced, and water seepage is most likely to occur.

    2. Wall treatment.

    If the bathroom has a shower room, the waterproof should be 180cm, and if there is a bathtub, the waterproof height of the wall adjacent to the bathtub should be 30cm higher than the bathtub.

    3.Waterproof dead space.

    During construction, it should be noted that the joints between the walls and the ground and the joints between the water and water pipes and the ground are the most likely to cause problems.

    4.Closed water test.

    After the completion of the waterproof construction, the closed water storage test shall be carried out, and the water at the highest point of the ground shall not be less than 2 cm, and no leakage shall be deemed qualified after more than 24 hours. After the installation of the equipment is completed, the secondary water storage test is carried out.

  6. Anonymous users2024-01-19

    Generally, the waterproofing of the bathroom should be done for 2 3 days, which is mainly because the waterproofing of the bathroom is generally done 2 or 3 times, and the wall is to be done on both sides of the ground, and it is best to do it three times, that is to say, the waterproof layer of the ground should be close to a millimeter of thickness to be transparent, to ensure that there will be no water seepage in the future, and do it once a day, if the ventilation conditions are good, it can be dried in one day and can be done a second time the next day.

  7. Anonymous users2024-01-18

    First, it will take a few days for the bathroom to be redecorated again.

    1. First of all, bathroom decoration, waterproof and waterproof test is a more time-consuming one, this is generally a week, if the waterproof test is unqualified, it must be reworked, it will take a few more days. The rest is to lay clean water pipes and sewage pipes, stick to the wall and floor tiles, top ceilings, install bathroom equipment, etc., one of which is the solidification time of cement, so it will take at least half a month to calculate. Although the bathroom area is not large, these decoration processes are indispensable.

    Second, the bathroom redecoration process.

    1. The bathroom belongs to the second decoration, so we must knock off the previous tiles before we can use the tiles we have purchased to pave them. This point is particularly noteworthy, when breaking the original tiles, you must pay attention not to knock on the sewer pipe, the toilet sewer is generally more than one, so it is particularly easy to be knocked if you are not careful. When knocking on the tiles, no broken tiles should fall into the drain, otherwise they will be blocked.

    2. Knocking on wall tiles must use professional tools and professional construction personnel for construction, once the knocking is improper, it is easy to have a certain impact on the wall, and even involves building safety issues. After breaking the tiles, there may be more potholes on the wall, and we must fill in the potholes first, so that the wall is smooth and convenient for tiles to be laid later.

    3. When the bathroom wants to be redesigned, it is necessary to carefully and comprehensively consider some problems that will be encountered, so that when the reinstallation is carried out, the construction process will be smoother and the construction period will be faster. If there is no plan or design in the early stage, it is very likely that there will be unsatisfactory results when renovating.

  8. Anonymous users2024-01-17

    1: Do a good job in hydropower infrastructure projects.

    From a safety point of view, it is better to go up the bathroom water pipes and wires than to go down. However, many "guerrillas" are greedy for labor-saving, and water and electricity go to the ground, and even dig grooves and round holes in the bathroom.

    2: Clean the base and walls.

    The house is decorated with waterproof, involving a balcony, a kitchen, a bathroom, but the focus is on the bathroom. First of all, use a small metal hammer to knock on the wall and ground, if you find a "poof" empty sound, it means that there is a hollow drum inside, and you must knock out all the hollow drum parts. Then carefully clean the four wall base layers and the floor, pull out the nails, clean up the miscellaneous garbage, rinse it with clean water, and then let it dry.

    3: Do a good job of rigid waterproofing.

    All kinds of sewer pipes in the bathroom can not be changed, try not to change them; In case of change, you must not use cement mortar to fill the pores, and you must plug the leakage king to fill it three times.

    4: Do the second level of elastic waterproof coating.

    After a long time in the new house, the hard plugging king elastic coating will be cracked alive due to settlement, thus losing the waterproof effect. Therefore, it is necessary to add a second insurance - elastic waterproofing coatings.

    1. Try not to damage the original waterproof layer.

    In the newly delivered high-rise building, the waterproof layer is usually made in accordance with the relevant standards, but in the process of decoration, some bathroom bathing equipment and a variety of water and water pipelines may be re-planned, and then the original waterproof layer of the building may be damaged. Qinglong Construction recommends that friends who need decoration should try not to damage the original waterproof layer, and if it is damaged, it must be repaired in time to avoid leakage in the future.

    2. Re-paving floor tiles should be waterproof on the ground.

    If you need to replace the original floor tiles in the bathroom, after chiseling off the original floor tiles, you must first level the ground with cement mortar, and then do waterproof treatment, so as to avoid leakage caused by uneven thickness of the waterproof coating.

    3. The wall must be waterproof.

    Water will splash on the nearby wall when bathing in the bathroom, and if you don't do waterproofing, the wall will be prone to mildew, so you must do a good job of waterproofing the wall before laying wall tiles. Qinglong construction suggests that the wall should not be less than 30 cm when waterproofing, and if the load-bearing light wall is right, the entire wall should be waterproofed.

    4. The grooves of the water pipes in the wall should also be waterproof.

    During the construction process, when pipes, floor drains, etc. pass through the floor slab, it is necessary to carefully construct the waterproof layer around the hole. Buried water pipes in the wall, so as to achieve reasonable planning, lay water pipes are all made larger than the diameter of the groove, the groove is plastered smoothly, and then the groove is brushed with polyurethane waterproof coating.

  9. Anonymous users2024-01-16

    When the waterproofing construction of the toilet is completed, in order to test the effect and quality, a closed water test must be carried out. The duration of the closed water test should be at least 24 hours, and it is more desirable if it can be 48 or even 72 hours.

    The requirements of the closed water test are based on the change of the water storage height, and the first half of the test should be checked downstairs every hour as much as possible; The second half of the body can be observed about once every 2 to 3 hours.

    At the same time, the spray test in the shower area should not be missing. Splash water on the shower area, and observe the back wall every 20 to 30 minutes for signs of water seepage. Repeat the operation several times.

  10. Anonymous users2024-01-15

    1. In general, the water can be tested 24 hours after the normal construction is completed. The test time is 24-48 hours.

  11. Anonymous users2024-01-14

    The two-day bathroom is waterproof and leakage, and the surrounding walls need to ensure that the height of the painting is not less than 30 cm; If there is a shower, the height of the waterproof paint applied on the installation of the shower faucet and the adjacent wall should not be less than 150 cm, preferably about 180 cm. After the waterproofing is done, a closed water test should be done. It is to put the water on the floor of the bathroom, so that the ground is completely submerged in water about 3 4 cm, and set a fixed elevation (horizontal plane); After 24 hours, if the water level is below the set elevation, it means that there is a water seepage problem on the ground, that is, the waterproofing is not done well.

    In this way, it is necessary to re-do the waterproofing.

Related questions
8 answers2024-07-08

The bathroom is the place where we use the most water every day, so this is the center of our decoration, so many people in the renovation test of the bathroom floor tile waterproof treatment water, but the wall of the bathroom also splashes some water, and even often see the moldy corner of the lower corner of the bath, due to the water accumulation. Then,The walls of the bathroom must be waterproofed Is it? How to make bathroom wall waterproof? >>>More

11 answers2024-07-08

MAKE 1800MM FOR THE SHOWER WALL, AND 1200MM FOR THE OTHER WALLS.

2 answers2024-07-08

Hello. Generally, the bathroom floor waterproofing is only done once, the premise is that to choose high-quality waterproof membranes and waterproof coatings, you can search for the top ten waterproof brands on the Internet, and then confirm it on the building materials market. The waterproofing membrane is better to choose high-quality and expensive ones, not to be cheap. >>>More

6 answers2024-07-08

Bathroom waterproof regular thickness:

The ground is waterproof more than millimeters. It can't be decided by the number of passes. The pipe root and the corner of the reinforcing layer are brushed first, and after the surface is dried at room temperature for 4h, then a large area is brushed and scraped. There shall be no leakage and bubbling. Brush a large area for 24 hours and then apply the next layer after curing. >>>More

5 answers2024-07-08

In principle, the waterproof layer on the waterproof bathroom wall should not be less than meters, and from the perspective of moisture-proof, it is best to do wall waterproofing in the shower room or toilet. The installation position of the power switch should be designed in advance, and should not be installed behind the door, which is inconvenient to use; The power socket is 30 cm above the ground, and the switch is 30 meters above the ground. Cement can not be used after 3 months of factory life, and cement of different varieties and grades cannot be mixed. >>>More