Today, the renovation of the new house started, and after knocking down the bathroom door wall, it w

Updated on Bathroom 2024-07-29
1 answers
  1. Anonymous users2024-01-24

    It's not the same, the steel wire mesh pressed by the original structure is the structure above the door opening, and the steel wire mesh on the surface of the new wall is brushed in order to stick the bricks and not fall off.

Related questions
1 answers2024-07-29

This is what you are talking about, and the interior decoration is ready to change the wall. In this case, the newly renovated wall also needs to be hung with steel wire mesh, which has the same effect as the original wall hanging steel wire mesh, in order to prevent cracks (or cracks) between the new wall and the original structure. If you renovate the old and new walls and walls (or columns) without steel wire mesh, it will definitely have an impact on the quality, not only the phenomenon of cracks and cracks, but also the potential safety hazards due to "no reliable connection", and even the possibility of collapse in the event of an earthquake.

1 answers2024-07-29

It depends on whether it is a brick concrete or a frame structure, and if it is not a load-bearing wall, it can be removed.

1 answers2024-07-29

The bathroom wall is knocked out to make a sliding door, and the wall can be knocked to the top without having to hit it. . . >>>More

1 answers2024-07-29

Reluctant to decorate for the design, the nine look at me like this situation to generally in the second half of the year.

4 answers2024-07-29

He's right, there's no need to re-waterproof. As long as you are careful not to damage the waterproofing when removing the old tiles, it is OK, in fact, the cement layer on the waterproof generally has a certain thickness, and it will not be easily damaged, you can rest assured.