It is necessary to remove the heating first, make it waterproof, and reinstall it after pasting the bricks.
-
I removed the radiator first. It is recommended that you use Qinglong waterproof material.
-
Roll waterproof with a small roller and roll a few more times!
-
It's not a big problem if the walls are not waterproofed.
Bathroom waterproofing process 1: brush the waterproof paint for the first time. Before construction, it is necessary to ensure that the ground is dry, and the waterproof coating should be coated with no omission, firmly combined with the base layer, no cracks, no bubbles, and no falling off. The coating height is consistent, and the thickness should meet the requirements of the product. >>>More
The radiator in the bathroom is generally a small back basket. >>>More
It needs to be redone, because in the process of reinstalling the bathroom, the worker master will not guarantee that it will not destroy the waterproof layer that was done before, if you are on the first floor, you don't have to do it again, if it is not the first floor, it is recommended to redo it, because once the water leaks and has to be renovated, the loss caused is not a little bit, and the current waterproof is not too expensive.
Knock off the tiles, ask someone to pick up the garbage, load the car to throw more than 500, the tile spring with the shop + moving fee 1500 + mason salary 1000, waterproof material 300, >>>More
This depends on whether your bathroom structure is responsible for arguing cavity, the degree of difficulty of construction to dig and decide, under normal circumstances, the size of the ordinary bathroom area is judged to star, even dismantling to install it in about 3-4 days, the key is that the waterproof can not be constructed immediately.