The heating pipe under the floor of the bathroom leaked, and three tiles were planed, and now the pi

Updated on Bathroom 2024-07-26
1 answers
  1. Anonymous users2024-01-24

    Clean the underside and find the previous waterproofing layer. Brush two JS. Be sure to tie it with the previous waterproof layer. After 24 hours of drying. Test the waters.

Related questions
1 answers2024-07-26

To be precise, the main reason for the threshold stone is moisture-proof to separate the moisture of the bathroom from the wooden floor of the room, and it is also because of the above reasons that the construction must keep the threshold stone and the bathroom floor have a drop of more than 2cm. Color is mostly a matter of personal preference. In addition, the threshold stones that are commonly used are mainly brown-red or black, such as Chinese red, Indian red, Xinjiang red, (large and small) black golden sand, Mongolian black, etc. >>>More

2 answers2024-07-26

This should be asked to the people who repair the pipeline, find a few more people who do this, and ask who is cheaper and who uses whom.

2 answers2024-07-26

Yes, because the tile itself is impermeable, if it leaks, it is generally a leakage of the tile gap, and only the tile gap needs to be treated well to achieve the effect of no leakage. Don't have to go through the hassle of smashing tiles.

2 answers2024-07-26

If possible, it is best to replace the cut wire, and then use a larger electrician pipe to cover the broken electrical pipe, and lay a good water glue to prevent waterlogging.

1 answers2024-07-26

1. In the installation of toilet radiators, Baiying adopts toilet radiators to form a loop heating system. >>>More