Toilet waterproofing is only done for floor drains and waterproofing near the toilet, or the entire

Updated on Toilets 2024-07-22
4 answers
  1. Anonymous users2024-01-24

    The general decoration company cut corners, will do this, this is not impossible, but after a long time will seep water, it is recommended to do the entire ground, especially the floor drain and toilet position, to brush the waterproof paint several times.

  2. Anonymous users2024-01-23

    I don't think it's very safe, the waterproofing of the bathroom must not be sloppy and careless, don't really move in in the future, there will be potential troubles, and it doesn't cost much more to do a whole bathroom, so as not to be claimed if there is something in the future!

  3. Anonymous users2024-01-22

    Water is osmotic and spreads as long as it gets wet. So waterproofing must be done in its entirety.

    Not just the ground, but also against the wall below.

    It is recommended not to find this person to do it, layman, it will be very troublesome to leak it in the future.

  4. Anonymous users2024-01-21

    Not only should you do it on the ground, but also make 300mm along the surrounding walls, and in the shower area, you should make the wall high waterproof! After doing this, a 24-hour water storage test should be carried out.

    Fire and water are ruthless, rather than less. Start worrying more and do it to the extreme, and you can rest assured later!

Related questions
3 answers2024-07-22

Before the developer hands over the house, the bathroom and kitchen waterproofing of the house need to be done by the developer before the house can be delivered. >>>More

2 answers2024-07-22

1. Determine the elevation of the ground drain, install the fixed cushion slope finding, lay the leveling layer, seal the waterproof additional layer around the floor drain, lay the waterproof layer, store the test, lay the surface layer, and place the floor drain grate; Pouring slab holes: >>>More

1 answers2024-07-22

Method of secondary drainage in the bathroom:

1.The bottom layer is first smoothed with cement mortar. >>>More

1 answers2024-07-22

The design is different – some bathroom drains and toilets run down a drain, while others don't. In both cases, just look at the space design!