Whether it's the bathroom floor tiles or the living room floor tiles first, you can do it. They do not conflict. Because they are not on a flat surface, they are self-contained and do not cause any trouble for the process and protection. I hope my answer can help you.
-
The good paste is the first to paste that, who first and who has no essential connection, it should be noted that when pasting the living room first, it is necessary to grasp the height, because the floor level of the living room should be higher than the bathroom.
-
Bathroom, because the bathroom is buried in the pipe, the height of the floor tiles is uncertain.
1. All are generally sealed first and then tiled.
One is because it is more beautiful, and the other is because it will be better waterproof. >>>More
Home renovation is to install the ceiling first. Before the installation of the integrated ceiling, there is no pre-embedded smoke pipe, which will lead to a series of problems such as small suction power of the range hood, high noise during machine operation, severe machine shaking, oil accumulation, oil leakage and smoke smell in the public flue. >>>More
It must be the ceiling first, and then the cabinet is installed after the ceiling is completed.
Lay bricks first (keep the ground flat) and then make a water retaining strip. The purpose of this is to ensure the overall perfection to the greatest extent, which is conducive to waterproof and other structures.
First make the door sleeve and then the floor, then install the door, first hang the ceiling and then press the cabinet.