Home renovation Do you do the flooring first or do the door covers and doors first? There is also th

Updated on Kitchen 2024-06-20
5 answers
  1. Anonymous users2024-01-24

    First make the door sleeve and then the floor, then install the door, first hang the ceiling and then press the cabinet.

  2. Anonymous users2024-01-23

    Install the floor first, and then install the door, so that if you find a problem between the door and the floor when installing the door, you can fine-tune the door. The kitchen is installed with suspended ceilings and then cabinets. (There are fewer and fewer doors and sets on site).

  3. Anonymous users2024-01-22

    In fact, you can, but my home is to lay the keel first, install the door, and then the floor, to be honest, dealers want their goods to be installed at the end, so that there will be no damage.

  4. Anonymous users2024-01-21

    Install the door first and then install the floor, so that it will not be scratched to the floor, and the kitchen is the first to install the cabinets on the ceiling.

  5. Anonymous users2024-01-20

    Of course, press the floor first, and then install the door; Hang the ceiling first, then install the cabinets.

Related questions
2 answers2024-06-20

If it is a building decoration, it should be done first to make the door frame (set), and then to make the door, because there is an accurate size of the door frame, and it is good to cut the door when making the door.

2 answers2024-06-20

Home renovation is to install the ceiling first. Before the installation of the integrated ceiling, there is no pre-embedded smoke pipe, which will lead to a series of problems such as small suction power of the range hood, high noise during machine operation, severe machine shaking, oil accumulation, oil leakage and smoke smell in the public flue. >>>More

9 answers2024-06-20

To lay a wooden floor, the ceiling should be suspended first, and the scratch resistance and compression resistance of the wooden floor is relatively low. If the floor is laid first, the floor surface will be damaged during the renovation process, and scratches will appear. Floor tiles (porcelain, terrazzo, crystal glass tiles, etc.) can be paved with floors and then suspended ceilings, which will not have any effect on the floor surface.

1 answers2024-06-20

Lay bricks first (keep the ground flat) and then make a water retaining strip. The purpose of this is to ensure the overall perfection to the greatest extent, which is conducive to waterproof and other structures.

2 answers2024-06-20

It must be the ceiling first, and then the cabinet is installed after the ceiling is completed.