To install the toilet, you only need to have a reserved sewer pipe, and the others do not need to be reserved.
-
If you're in a shopping mall, of course you can.
-
What does this pre-hole mean?
The water supply of the toilet bowl is a water supply location of the water reform project, and it must be there.
The drain hole of the toilet is the drain hole of the original building.
Didn't understand what you meant.
-
It is possible to build a wall and pre-bury the drainage pipe.
If there is no shower hole in the bathroom decoration, then the better way is to remove the plaster and re-construct, although it is more troublesome, but it will be a more satisfactory way.
The center hole of the toilet bowl is more than 300, and the thickness of the tile cement slurry is 20, and it is better to leave 320 mm. >>>More
Of course, it is possible to wait until the bathroom waterproof is completely dry, it is recommended to do a closed water test to check whether there is any negligence in the waterproof construction, whether the waterproof function is sound, and wait until the closed water test is passed, and then place it and wait for the knot. >>>More
All you have to do is buy some filler cement to make up for it, and when it's dry, then install the socket.
Your question doesn't mention any waterproof materials, so for the time being, you'd better do another closed water test, 12 hours is fine. If there is no leakage, then til. After all, a leak in the bathroom is a headache.