After the bathroom is tiled, can it cover the smell of the original waterproof asphalt?

Updated on Bathroom 2024-07-06
3 answers
  1. Anonymous users2024-01-24

    Waterproof asphalt is toxic and can seriously affect human health.

    After asphalt is laid, the doors and windows must be fully opened for ventilation for three months before moving in.

    Because the smell itself is there, not the tile can be pressed, so the best way is to ventilate for a period of time, and then use the tile to press, only in this way can it be done.

  2. Anonymous users2024-01-23

    When asphalt is waterproofed, it is necessary to choose a relatively high level of toilet asphalt for waterproofing, and do not buy too bad for a while. If the asphalt used smells very strong, it means that it contains chemicals that are not good for the human body, which is not good for human health.

    Generally speaking, tiles do not stop the emission of toxic gases. Because the connection between the tile and the asphalt is not completely tight, there is also a gap between the tile and the tile, and the tile joint cannot be completely sealed with ordinary cement, and will pass through chemical gases.

  3. Anonymous users2024-01-22

    What can be covered is now waterproof and asphalt. No problem at all, rest assured.

Related questions
2 answers2024-07-06

It has nothing to do with waterproofing. The tiles bulge up because there is no gap in the expansion, and then the tiles squeeze each other, and the tiles must leave a gap of about 1 mm between the tiles, just like the gap between the rails in the past. If the tile falls off, then there may be a problem with the waterproofing, and the adhesion of the tile will be poor after the waterproofing is done, and the tile will generally need to be treated with an interface agent. >>>More

1 answers2024-07-06

Then you have to connect the open wire socket, or you have to knock off the tiles.

4 answers2024-07-06

After the bathroom is waterproofed with waterproof coating, in order to ensure the strength of the waterproof layer, it is recommended to make a protective layer of mortar, and then start to paste tiles. >>>More

1 answers2024-07-06

It is best to remove the original waterproof layer directly, and then re-cement whitewash, then re-make a new waterproof layer, and then carry out two important 24-hour closed water test operations to ensure the safety of the waterproof layer.

1 answers2024-07-06

The water will only come out of the storm, that is normal. If this is the case for many years, it may be that there is a water leak somewhere