Whether it is a visa to erect a temporary toilet at the construction site of the project and backfil

Updated on Toilets 2024-07-29
1 answers
  1. Anonymous users2024-01-24

    The amount of rubble to be filled should be clearly written. Attach a floor plan of the refilled gravel road, a section of each thickness, and the detailed dimensions are indicated in the drawing. Photographs of the site should be attached, both from a long view (to prove the location of the replacement) and a close-up (with a close-up photo showing the measured dimensions).

    The reason for the replacement should be clearly stated (design requirements or on-site determination), and the representatives of all parties on site (Party A, supervision, construction, etc.) should jointly sign and recognize.

Related questions
2 answers2024-07-29

There is usually only one toilet on the construction site.

1 answers2024-07-29

It is roughly estimated according to the scale of the project and the number of organizational personnel, so it is impossible to calculate it in such a general way.

2 answers2024-07-29

With this kind of identity, there is nothing to like to eat.

1 answers2024-07-29

The following are the construction specifications for home decoration ceiling projects and the acceptance items of ceiling projects: 1 General provisions for ceiling engineering This chapter is applicable to the construction of open keel and dark keel ceiling projects. The installation spacing and connection mode of the boom and keel should meet the design requirements. Rear embedded parts, metal booms, and keels should be treated with anti-corrosion. >>>More