Whether the bathroom fixtures are paid first or later

Updated on Bathroom 2024-07-26
2 answers
  1. Anonymous users2024-01-24

    Pay a part first, and after installation, make up the rest.

  2. Anonymous users2024-01-23

    Generally, the deposit is paid first, and the balance is paid after the goods arrive at your home or installed, mainly depending on how you negotiated with the seller before.

Related questions
1 answers2024-07-26

The payment method and method of the project shall be performed in accordance with the contract, and the terms of the contract shall be valid in accordance with the 'Contract Law'.

1 answers2024-07-26

When laying floor tiles, the tile will calculate the location of the partition according to the toilet floor drain (if the pipe is not changed), and then lay the water retaining strip and the floor tile together. Of course, it is better to have as wide a partition as possible, and the toilet should not be too cramped. Install the toilet bowl after laying the floor tiles.

1 answers2024-07-26

1. The cost of all jade is a little higher, but it is more delicate and beautiful, which is inconclusive, after all, the required style and service life are different for everyone.

6 answers2024-07-26

It should be said that the waterproofing is done in the process of decoration, and it is usually done before the tile is pasted. >>>More

5 answers2024-07-26

Hello, I'm sorting out the answers based on your questions, please wait a while The caisson is the structural part of your bathroom This must be done first and then waterproof! This will ensure that you will not have water leaks in your home in the future!