  1. Anonymous users2024-01-24

    Oh, it is called the water storage test, which is to test the quality of the previous waterproof construction, and it is generally required.

  2. Anonymous users2024-01-23

    Yes, for once and for all. Check the reliability of the waterproof. If it does not cause trouble in the future, it is better to soak in water for 24 hours before construction.

  3. Anonymous users2024-01-22

    It's better to run it and you can try it if it's not waterproof.

Related questions
1 answers2024-07-10

Whoever constructs is responsible. Tube for 5 years. 1. If the root of the pipeline is connected to the concrete slab, use the plugging king to plug it. 2. If the roof cracks leaks, it can be grouting at high pressure, or it can be treated with brick-free waterproof materials.

2 answers2024-07-10

To deal with it, either tear it off, or use a cutting machine or percussion drill to pull the hair, so that the cement of the tile and the cement of the original wall can be connected as much as possible, so that it is more firm.

6 answers2024-07-10

If it is a water leak found before the decoration, and there is no decoration upstairs, then you can find the developer, which belongs to the problem of the house itself, but if the upstairs has been renovated, this may be a problem when the upstairs is decorated, then you have to negotiate with your upstairs.

2 answers2024-07-10

Rest assured, there should be no problem, but there is a little decoration material that cannot be stored centrally, and should be placed against the wall in each room to prevent safety problems.

3 answers2024-07-10

Hello! The mandatory elevation of the bathroom you described is the floor height of the house, which should be shown accordingly in the contract for the sale and purchase of commercial housing. >>>More