What to do if there is stagnant water in the caisson in the bathroom

Updated on Bathroom 2024-07-20
1 answers
  1. Anonymous users2024-01-24

    Solution:

    Waste slag backfill, the advantage of this method is that the construction is simple, the price is cheap (generally about 300 yuan), the disadvantage is that I am afraid that a certain part of the floor slab is overweight, and the general good property is not allowed, this method will be gradually eliminated.

    Before overhead, the old structure needs to be waterproofed once. In fact, it is also a cushion treatment, and then it is 20 45mm mortar leveling, slope finding layer - waterproof layer - cement mortar waterproof protective layer - brick surface layer. (Plus the old structure is waterproof once, which is a double waterproof treatment.)

    Ceramsite backfilling, this way is the best way, but the price is also the most expensive (more than 800 yuan). Moisture-absorbing and moisture-proof ceramsite fill, broken bricks and fine sand filling.

    In fact, it is the cushion treatment, after the broken bricks and fine sand are filled, it is necessary to do a layer of 50 100mm thick concrete slope layer - 20 45mm mortar leveling - waterproof layer - cement mortar waterproof protective layer - brick surface layer. The moisture-absorbing and moisture-proof ceramsite landfill can be changed to fly ash mixed with broken brick landfill.

    Use the caisson drain to dredge the way, and discharge the water of the toilet caisson into the main riser through the seepage hole of the caisson drain, so that the toilet caisson is in a relatively dry state, and prevent leakage into the lower neighbor sleeve and the wall of this floor. The caisson drain has the following features:

    This drain can prevent odor, clogging and overflow.

    The black waterproof protective ring is easy to remove after the waterproof test, just cut it with scissors.

Related questions
2 answers2024-07-20

A caisson toilet is a sunken toilet. It refers to the partial or overall sinking of the structural layer of the toilet from a certain height (generally 35CM to 40CM) of the corresponding floor during the construction of the main body, so that the horizontal drainage pipe of the toilet is buried in it, and then backfilled with lightweight materials. In order to flexibly arrange toilet facilities and meet the needs of humanized living, the house mostly adopts caisson toilets, and the drainage pipes can be changed according to their actual needs. >>>More

1 answers2024-07-20

This situation cannot be completely solved – unless the floor tiles are resurfaced. The current measure is to glue a water baffle on the edge of the shower space so that the water does not flow unexpectedly. Control them to the drain!

1 answers2024-07-20

According to the requirements of the relevant specifications, the casing should be installed in the drainage (caisson) toilet on the same floor. >>>More

3 answers2024-07-20

When the sunken toilet caisson is full, the water will seep up and down the wall, and finally cause damp and moldy in the room behind the wall. If you want to improve, you have to do secondary drainage at the bottom of the caisson in the sunken bathroom.

6 answers2024-07-20

1. Moisture-absorbing and moisture-proof peach (should be pottery) particles are landfilled, and broken bricks and fine sand are filled. (Filling the sedimentation tank). >>>More