  1. Anonymous users2024-01-24

    If there is no dripping, there may be two, one is that there is really too much water and has not seeped dry, and the other is that there is a leakage, which happens to seep small! In any case, after a while, if you don't do it, if you want, you can ask for more information upstairs to deal with, better advice, free professional technical advice on concrete waterproof leakage repair, avoid repairing today, leaking tomorrow; Repair every year, the trouble of leaking every year.

  2. Anonymous users2024-01-23

    According to your description, the analysis is generally caused by the damage of the waterproof layer, the pipe root is the most prone to this situation, the other two leakage points may be second only to the second lowest level of the pipe root leakage point, there is a lot of water accumulation (just like the original toilet cracks) The water level rises and there are two possibilities: there are two possibilities for replacing the toilet There are still slight leaks:

    First, the toilet sewage is caused by infiltration into the bonding layer;

    The mortar bonding layer around the sewage pipe is not waterproofed, because the bricks are paved with dry and hard ash, the bonding layer is not compact, and the residual water seeps into the bonding layer around the pipe root when the sewage is discharged, so it is always not dry but the amount of water is less.

    This situation will be the most likely and easier to maintain, you just need to disassemble the toilet to observe, if the joint layer is higher than the sewage nozzle, the mortar joint layer towards the pipe root side of the coating of several two-component waterproof coating film (each non-stick hand after the coating of the next one) can be, if the sewage nozzle is higher than the joint layer, you need the pipe wall and the joint layer gap perfusion plugging plugging spirit plugging dense, if not too complicated, then chisel the floor tiles around the nozzle to the floor, the chiseling area first close the masonry under the bottom width of 100, and the same height as the joint layer of the positive trapezoidal dam, Then the entire area is fully coated with 3 or 5 two-component waterproof coating films, and then the floor tiles are restored, which is of course the best.

    second, it is caused by surface water infiltrating into the bonding layer;

    This situation is more troublesome, the surface water may penetrate from the gaps around the tile and floor drain, or it may be infiltrated from the brick surface and accumulate a lot, it is necessary to carefully find the leakage point and plug it, the focus is on the bathing area, the joints between the ground bricks are densely sealed with special caulk, and the wall and floor tiles, corners and other places can also be blocked with weather-resistant glue; If there is still a problem, it may be a slight penetration caused by the floor tile itself, after all, the tile has a certain permeability coefficient, especially in the aforementioned bath and other watery areas, in that case, you need to chisel the existing three leakage points, in the largest possible range to do local waterproofing to ensure that the original waterproof layer is effectively connected, the premise of this is slight water seepage, if the amount of water is more, there are still hidden dangers, after all, the higher the water position, the more leakage points, then you have to re-do the overall waterproofing, but I guess you will not be so back, It is recommended to open the toilet first to observe, but hopefully it is still the reason around the nozzle.

  3. Anonymous users2024-01-22

    In this case, it is useless for you to ask for help! Generally, it is customary to wrap the sewer pipe first, and then do it waterproof, and some don't even do it, so the water is very easy to flow down the pipe! There have been many water leaks in your home, and it may be that it is not waterproof!

    It's hard to deal with it now after installing and repairing! If there is a manhole in the upstairs pipe, you can use 2-in-1 waterproof to pour it into the pipe! You can get a little more and make it flatten on its own!

  4. Anonymous users2024-01-21

    After the original waterproof layer is damaged, and then the damaged place is redone, then the new waterproof layer is not firmly bonded with the waterproof layer made at the beginning, and there are gaps, although you can't see it with the naked eye. But water is pervasive. And the bathroom is a damp place.

  5. Anonymous users2024-01-20

    Find something upstairs! In general, in this case, the same upstairs housing is responsible!! If he misses, look for him!! If you get it yourself, you will have to pay a lot of money, not to mention it, and it will be very troublesome!!

Related questions
12 answers2024-07-15

1. Redo waterproofing.

Redoing waterproofing means re-laying the floor tiles, removing the original tiles and cleaning the base surface. After the cement mortar is proportioned, the ground is leveled and further waterproofed. The height of the waterproof wall is controlled at about 30cm, which is the main waterproof method. >>>More

3 answers2024-07-15

1.See if you have the ability or basic knowledge of this area; >>>More

2 answers2024-07-15

At the joints between the sewer pipe and the floor drain and the ground, use a high-pressure gun to glue. After that, cover it with mortar, and then do a comprehensive waterproofing, brush waterproof paint. But the waterproof coating must be a qualified brand. >>>More

5 answers2024-07-15

If it is not convenient to do, then close the main valve, at least one day without water to try, if you suspect the next door, then ask him to close the valve at another time.

19 answers2024-07-15

First of all, we should first observe the walls around the bathroom of our home to see if each wall is bulging or peeling, if the position of the bulging or peeling is about 30 cm up by the ground, it means that the position of the corner of the bathroom is leaking, if it is in the middle and upper part of the wall there is bulging or peeling, it means that the part of the wall is not waterproof. >>>More