  1. Anonymous users2024-01-24

    After doing the base layer, start to do waterproofing. Generally, when making the waterproof layer, everyone neglects a problem, that is, the base layer of the waterproof layer; I think that as long as I buy the materials, I can do it, but in fact, it is not; The base layer is not good, and no matter how good the material is, it cannot guarantee the waterproof effect; Therefore, the base layer is not good or bad, which plays a very important role in waterproofing; The requirements for the grassroots are that there is no sand, no cracks, smoothness, and no hollowing; Different materials have different requirements for the humidity of the substrate; If the ground is slotted, the buried pipe can be repaired before the waterproof layer can be made.

  2. Anonymous users2024-01-23

    It is best to do it when the decoration enters the site, and at the latest in the bathroom when the floor tiles are pasted, you think about it, if you wait for the tiles to be pasted before you find that the water is leaking, then you have to pry and redo, otherwise, your downstairs neighbor must not agree.

  3. Anonymous users2024-01-22

    The safest way is to make a groove in the place where the plumber needs to install the water pipe in the bathroom, and it is best to play a deep point, and not be busy installing the water pipe, which is the most suitable for waterproofing at this time

Related questions
11 answers2024-07-10

After the wall is renovated, the water and electricity have also been changed, and the waterproofing of the kitchen and sanitation must be done before starting to tile.

1 answers2024-07-10

Are you asking about the implementation time of JGJ298-2013 "Technical Regulations for Residential Indoor Waterproofing Engineering"? >>>More

12 answers2024-07-10

The bathroom is heavy and needs to be waterproofed, so when should the bathroom be waterproofed? >>>More

2 answers2024-07-10

It is best to do it before the renovation and try to decorate it again after a week or so without water leakage.

2 answers2024-07-10

Do waterproofing first, and then do a closed water experiment after waterproofing, and then you can paste tiles.