    Use expansion screws to fix to the ceiling.

    Gypsum board ceiling installation process 1

    Bullet roof level: According to the design elevation, the ceiling elevation line is played along the wall around, and along the elevation line of the roof, the keel binning position line is drawn on the wall.

    Gypsumboard ceiling installation process 2

    Install the main keel boom: after playing the ceiling elevation line and the dragon position line, determine the elevation of the lower end of the boom and install the boom. Straight installation is fixed to the structural ceiling with expansion bolts. The specifications of the boom meet the design requirements, and the spacing is less than 1200mm.

    Gypsum board ceiling installation process 3

    Installation of the main keel: the spacing of the main dragon is 900 1200mm. The main keel is connected with the boom with the matching dragon hanger.

    Gypsum board ceiling installation process 4

    Install the secondary keel: the secondary keel spacing is 500mm 600mm, and the secondary pendant is connected with the main keel.

    Seam treatment: Paste paper tape caulking paste is used between the seams of the board for caulking treatment.

    1. To put it simply, the integrated ceiling is to make the ceiling module and the electrical module into a standard specification of combinable modules, which are integrated together during installation. But don't underestimate this kind of "integration" behavior, the characteristics of this "integration" is very obvious - beautiful "top": different from the previous kitchen and bathroom ceiling rigidly installed bath bomb or ventilation fan or lighting effect, after the installation of the integrated ceiling is no longer a rigid combination, but a beautiful and coordinated top shape.

    2. Function "top": independent heating lamp, independent lighting, independent ventilation fan, can be reasonably arranged installation position, overcome the embarrassment of the traditional bath bomb installation position, the heating lamp can be installed directly above the shower area, the lighting lamp is installed in the middle of the room or the position of the washstand, and the ventilation fan is installed directly above the toilet, so that each function can be placed in the most needed space position.

Related questions
1 answers2024-07-10

Hello, the quality is different, the price varies greatly. There are many domestic manufacturers of gypsum board, it is recommended that you find a few more samples to compare, see the quality difference, and the one that suits you is the best. At the same time, for different places, the economic level is different, and the labor force is even more different. >>>More

1 answers2024-07-10

Each square plate, 38 light steel main bone with one meter, according to the meter of the gap calculation, T-shaped paint keel per square meter with branches, auxiliary bones with branches.

6 answers2024-07-10

If you want to install the crystal lamp, you should fix the expansion bolt to the top surface in advance before doing the ceiling (modeling), that is, you should be ready to install the crystal lamp in advance - the crystal lamp is relatively heavy! >>>More

5 answers2024-07-10

The method of installing an integrated bath bomb in a gypsum board ceiling is as follows: >>>More

1 answers2024-07-10

Clause.

First, the material of the light steel keel gypsum board ceiling construction process. >>>More