    Clause.

    First, the material of the light steel keel gypsum board ceiling construction process.

    The materials that need to be prepared for the construction process of light steel keel gypsum board ceiling: light steel skeleton, pendant, connector, hanging plug-in, boom, nail, self-tapping screw, cover panel, adhesive.

    Clause. Second, the operating conditions of the light steel keel gypsum board ceiling construction process.

    1.After installing the walls and pillars of the ceiling room for masonry, it is necessary to install rotten wood bricks at the height of the shed.

    2.Determine the location of all the pipes, vents, etc. in the ceiling.

    3.The materials are fully equipped.

    4.Set up the operating platform shelf for construction.

    Clause. Third, the light steel keel gypsum board ceiling construction technology.

    1.Snap the elevation line of the ceiling.

    According to the surrounding walls of each floor, the horizontal control line is played, and the line is required to be clear and accurate.

    2.Divide the binning line of the keel.

    The installation requires the keel binning line to be divided on the roof elevation line of the main and secondary keels.

    3.Install the main keel boom.

    In order to ensure the stability of the whole skeleton, we need to fix the angle steel with expansion bolts, and determine the elevation of the lower head of the boom after the elevation line of the roof or the keel binning line, and the boom should not be in contact with the professional pipeline. If there is a conflict, it is filtered with a section steel bracket.

    4.Install the main keel.

    Use 50 type keel or paint keel, the middle arch position of the keel should be in accordance with the short distance of the room between 1 200 1 300, after the installation of the main keel, and then install the secondary keel, the pick end of the main keel is best not to exceed 300mm, if the main keel and professional pipes or large lighting conflict, we have to disconnect the main keel, and then reinforce with section steel, but to attach the main keel.

    5.surface layer in accordance with.

    After the installation of the keel, we have to let the professional builder carry out the surface layer construction, the surface layer is paper gypsum wool or mineral wool board, but to ensure that the connection between the surface layer and the keel is very firm and smooth.

    6.Install the shroud panel.

    Before we install the cover panel, we must inspect and accept the various pipelines in the shed, and only after the pressure is qualified, can the cover panel be installed. When the cover panel and the light steel skeleton are fixed, the cover panel can be fixed with self-tapping screws, glued fixing, toka fixing, etc.

    7.Brush with anti-rust paint.

    If you have not done anti-corrosion treatment, such as hanging parts, nailing accessories, etc., you must brush anti-rust paint before the installation process.

Related questions
1 answers2024-01-28

What you're talking about is generally the second level of the circumferential circle. >>>More

4 answers2024-01-28

The cost price in Xi'an is 50 yuan square meters, excluding the price of scraping putty and brushing latex paint.

3 answers2024-01-28

The spacing of the main keel is usually 900 1200, the secondary keel covered keel is 400 * 400, or 400 * 600, the side keel is the perimeter of the wall, the grille lamp and the maintenance port and the air conditioning Wang tuyere will have the keel strengthened, the ordinary decoration gypsum board with a single layer, the fine decoration gypsum board low with a double layer, the early high level with a single layer of 12 thick Lu Lingqin, there is a modeling ceiling, the amount of gypsum board is calculated plus loss.