The bathroom water installation drawings are wrong, how to calculate the reconstruction

Updated on Bathroom 2024-07-29
1 answers
  1. Anonymous users2024-01-24

    Toilet water and soil, nothing more than water supply and drainage, and bathroom appliances, etc., should not be ugly, find some books, atlas to see, on the line, for reference.

Related questions
3 answers2024-07-29

If you don't rework, this problem can't be solved, if it's not too impactful, I suggest you don't rework, it's all your money that is wasted, if it's bad, it's better to rework,

1 answers2024-07-29

The reason why the water tank installed on the roof of the bathroom does not store water is that the valve of the water tank is not closed in time after the water is added, so the water in the water tank flows back and is retained. >>>More

2 answers2024-07-29

You can leave an inner tooth bend from the center of the drain after the tile is pasted from the toilet bowl, that is, the toilet water connection. When buying a toilet, measure your pit distance. If the position of the toilet outlet is high, you can install the water pipe first and then install the corner raft, which is seriously inappropriate, only to knock off the tiles and redo the pipe, and any other practice is improvised.

2 answers2024-07-29

The main water pipe is leaking, and you need to find a property to deal with it. >>>More

12 answers2024-07-29

The water on the bathroom tub is always dripping, it must be that the water pipe joints are not tightly sealed, go buy some sealant or raw material tape, and reinstall it.