My bathroom leaked and redecorated and he asked for 2400, how to change the price with him?

Updated on Bathroom 2024-06-04
2 answers
  1. Anonymous users2024-01-24

    The walls and floor tiles and pipes of your house were all constructed by him, and it only took a month for the problem, and he must be fully responsible, and now the key problem is that you did not sign a contract or agreement before the construction.

    If he talks about credibility, he will work again, and now he doesn't want credibility, and you can't do anything about him, you have to consider yourself unlucky

  2. Anonymous users2024-01-23

    I think your counteroffer is secondary, finalizing the plan and list is the main thing, if he doesn't do it well, if your house leaks in the future, the loss will be much more expensive than what you have dropped.

Related questions
6 answers2024-06-04

This depends on whether your bathroom structure is responsible for arguing cavity, the degree of difficulty of construction to dig and decide, under normal circumstances, the size of the ordinary bathroom area is judged to star, even dismantling to install it in about 3-4 days, the key is that the waterproof can not be constructed immediately.

2 answers2024-06-04

Personally, I think that the choice of waterproof paint should also be good, you can choose some waterproofing for concrete, or waterproof paint for the bathroom.

3 answers2024-06-04

It needs to be redone, because in the process of reinstalling the bathroom, the worker master will not guarantee that it will not destroy the waterproof layer that was done before, if you are on the first floor, you don't have to do it again, if it is not the first floor, it is recommended to redo it, because once the water leaks and has to be renovated, the loss caused is not a little bit, and the current waterproof is not too expensive.

3 answers2024-06-04

Seeing what you say, there are actually a lot of projects, and if you change and repair, you won't be able to do it as expected. If you can afford it, I recommend that you remove and rearrange all the facilities in the bathroom. Of course, washbasins and urinals can be used after they are removed. >>>More

1 answers2024-06-04

Knock off the tiles, ask someone to pick up the garbage, load the car to throw more than 500, the tile spring with the shop + moving fee 1500 + mason salary 1000, waterproof material 300, >>>More