Urgently ask about the leakage in the bathroom, it has been found to be a waterproof problem, and th

Updated on Bathroom 2024-06-23
7 answers
  1. Anonymous users2024-01-24

    No, it is necessary to remove the bathroom wall and floor tiles as a whole, redo the waterproofing, and then do the closed water experiment, and then restore the tiles. The cost is around 3 thousand.

  2. Anonymous users2024-01-23

    No, it is necessary to remove the bathroom wall and floor tiles as a whole, redo the waterproofing, do the closed water experiment, and restore the tiles. The cost is around 4 thousand.

  3. Anonymous users2024-01-22

    After finding the leakage point and repairing it, I don't know if it will work, so I plug the floor drain and release water for 24 hours, and check the top surface of the lower layer to know. If it still leaks, then you have to start anew. Material: floor tile + accessories + labor about 1000 yuan.

    Manual scraping of the original floor tiles to remove, toilet basin dismantling and installation.

  4. Anonymous users2024-01-21

    There are three methods of general repair, one: chisel the ground surface layer around the seepage pipeline, dig out the loose layer in the hole around the pipe through the floor slab, brush off the floating ash, sand and other adhesions around the hole, and rinse it with water. Then use the plugging king to paint, and then brush the flexible waterproof material (such as JS polyurethane) on it after drying

    The following high-pressure grouting method, the following injection of water-swelled polyurethane, after drying, remove the water-stopping needle and smooth it with the plugging king Three: fully open the bathroom and make waterproof from the new. The advantage of one or two is that it is fast and the cost is less, and the disadvantage is that it can only ensure that the place is not permeable.

    Third, the advantage is to completely solve the disadvantage, which is the long construction period and the high cost.

    The question of money is to see how long the warranty lasts.

  5. Anonymous users2024-01-20

    Each place is not very different, anyway, it is labor cost + tile cost (should be less than 1 yuan a horse) + cement and other material costs, and maybe there are handling costs. It is estimated that it should be in a few hundred dollars.

  6. Anonymous users2024-01-19

    It can be used with waterproof paint, with acrylic waterproof paint, both indoors and outdoors, and the color is generally white. If applied correctly, it can ensure that there is no water leakage for 10-15 years, and the process of coating is mainly "thin coating many times". Each brush should be thin, divided into 3-5 brushes to complete (each brush should wait for the paint to dry before applying the next time), so as to achieve the desired effect.

  7. Anonymous users2024-01-18

    If it is with high-pressure grouting, it can last for a period of time, and if it is ordinary filling, the effect is not very large.

Related questions
2 answers2024-06-23

Do a waterproofing layer before laying bricks, and now it's late.

1 answers2024-06-23

Answer: First, close the toilet and then observe it carefully. If there are no obvious traces of leakage downstairs during the process of closing the water, it means that there is a problem with the water pipes. First, reconnect all the water pipes under the ground and seal them. >>>More

2 answers2024-06-23

Generally, after brushing waterproofing, turn off the water test.

2 answers2024-06-23

Since there is a bath cabinet, it is better to use the land to arrange it, even if it is blocked, it is easy to dredge, and there are many bends in the wall. >>>More

5 answers2024-06-23

THE HOUSE HAS BEEN BUILT WATERPROOF, USUALLY THE WATERPROOF LAYER EXTENDS FROM THE GROUND TO THE WALL, 250MM HIGHER THAN THE GROUND, BUT IN THE DECORATION, THE WATERPROOF OF THE KITCHEN AND BATHROOM CAN NOT BE AVOIDED, THE SURFACE OF THE BASE MUST BE SMOOTH, THERE MUST BE NO HOLLOWING, SANDING, CRACKING AND OTHER DEFECTS, THE MOISTURE CONTENT OF THE BASE SHOULD MEET THE CONSTRUCTION REQUIREMENTS OF WATERPROOF MATERIALS; THE WATERPROOF LAYER SHOULD EXTEND FROM THE GROUND TO THE WALL, 250MM HIGHER THAN THE GROUND, AND THE HEIGHT OF THE WATERPROOF LAYER ON THE WALL OF THE BATHROOM NEAR THE SHOWER HEAD SHALL NOT BE LESS THAN 1800MM; THE WATERPROOF LAYER OF THE COATING FILM IS EVENLY BRUSHED, THE GENERAL THICKNESS SHALL NOT BE LESS THAN 1 5MM, THE WATERPROOF SURFACE OF THE COATING FILM IS NOT BLISTERING, NOT FLOWING, SMOOTH AND CONVEX, AND THE JOINTS OF PIPE FITTINGS, SANITARY WARE FEET, FLOOR DRAINS, AND DRAINAGE OUTLETS ARE TIGHT, AND THE END IS SMOOTH AND DOES NOT LEAK After the waterproof project is completed, it is necessary to do a 24-hour water storage experiment. >>>More