How to fill in the sunken bathroom

Updated on Bathroom 2024-06-09
2 answers
  1. Anonymous users2024-01-24

    1. Clean and clean the caisson, fix the inlet and drainage pipes, stir the ceramsite and cement, fill and compact, and add barbed wire for leveling.

    Manipulation Rules: 1Before carrying out lightweight backfilling, the caisson should be cleaned and the inlet and outlet pipes should be fixed to avoid touching the pipes during backfilling.

    3.The bottom of the box should be made of ceramsite to make the secondary drainage channel, which is generally led to the secondary drainage port by the bottom edge or middle of the box.

    4.When the caisson is backfilled about 4 5, level about 30mm-60mm with cement mortar, and it should be compacted. If the bathtub is placed, 6 steel bars must be added to make a 20cm square.

    5.Finally, add barbed wire and use 1:3 to make cement mortar leveling, put the slope, and use it as a waterproof bottom layer.

    Second, quality requirements:

    1.The pipe is fixed and required to be firm.

    2.The ratio of ceramsite and cement should be accurate, add water accurately, and stir evenly.

    3.The joints of the barbed wire should overlap by more than 100 mm.

    3. Matters to be aware of:

    1.Compact but don't step on the pipes.

    2.The backfill should be dense.

    3.Iron wire and cement mortar should be collective, pay attention to the slope of cement mortar leveling.

    4.Pay attention to the elevation of the bathroom floor, and do not raise it above the floor of the corridor or hall.

    Link 1: Do two waterproof coatings, these two waterproofing must be done together with the wall, and the height of the wall should be more than 40 cm higher than the upper edge of the caisson. Ensure that the seepage water in the upper layer will not expand to the periphery, and can only be discharged to the floor drain.

    Link 2: Red brick or concrete is used to isolate the overhead, and the caisson is divided into several lattices of about 400*400. Many people don't do this step, in fact, this is quite the first link, with such a load-bearing isolation, the concrete layer above will not fall down.

    Otherwise, after a few years, the bathroom floor will sink, crack and leak.

    Step 3: Fill ceramsite or coal ash slag. Fill the moisture-proof ceramsite and the lattice, no need to press too tightly, and be generous, because it is not load-bearing, and only plays the role of absorbing water vapor.

    Step 4: Cloth reinforcement. A layer of 200mm*200mm square steel mesh formed by 5 mm diameter steel bars is placed above the lattice to ensure the firmness and uniform stress of the concrete layer.

    Session 5: Inverted concrete layer, 40 mm thickness C25 fine stone concrete leveling. This layer should be made of the water slope, do two times of waterproof coating, even the wall to do, after the waterproof layer is dry, it is necessary to brush the plain cement slurry to protect it, so as not to scratch when paving floor tiles and porcelain tiles.

    After the protective layer is dry, the Venerable Master will do the next step of tile paving work.

  2. Anonymous users2024-01-23

    Use sand, cement, water, mix together to make a paste, fill it and then flatten it, it's strong!

Related questions
10 answers2024-06-09

In fact, relatively speaking, the sunken bathroom is more waterproof 。Now when we design the bathroom, in fact, we will take into account its waterproof performance more fully, after all, in the bathroom area, a lot of water is often used, if the waterproof work of the bathroom is not done well, then it will make all kinds of problems in the process of subsequent check-in. >>>More

2 answers2024-06-09

Let's start with his merits 1It is convenient for the drainage arrangement of the bathroom, and the operation on this floor does not involve the downstairs. >>>More

3 answers2024-06-09

The sunken toilet refers to the partial or overall sinking of the bathroom structure layer from the corresponding ground to a certain height when the main body is built, which is generally about 30CM. COLLOQUIALLY SPEAKING, THE FLOOR LEVEL OF THIS BATHROOM IS ABOUT 30CM LOWER THAN THE FLOOR LEVEL OF OTHER ROOMS. Advantages of sunken toilet Compared with ordinary toilets, sunken toilets have three extremely significant advantages, one is that the sunken toilets do not have the pipes of the previous sewers, and the floor height of the bathroom is relatively higher; Second, the sunken toilet is convenient for the flexible arrangement of sanitary ware, and the location of sanitary ware can be set according to your own needs and preferences when receiving the room decoration, which meets the needs of humanized living; Third, it brings convenience to pipeline maintenance, which only needs to be carried out in the bathroom of your own home, and cannot interfere with the residents downstairs. >>>More

1 answers2024-06-09

Fill with slag, level with cement mortar, then brush with waterproof paint, and then pave the floor tiles.

3 answers2024-06-09

Yes, but three things are also recommended.

First, all pipeline nozzles should be completely closed with plugs, and plastic plugs should not be used. >>>More