Of course, the pipe is wrapped first, and the pipe must be fixed with cement and bricks before tiling, so that the tile is firm.
-
First use benzene board or insulation bricks to build up the pipe, and then paste the tiles. In order to prevent the cement from directly sticking to the expansion and squeezing the drainage pipe.
-
Wrap the pipes first, then the tiles.
-
Please use plastic film, steel wire mesh, and cement to wrap the pipe, and then paste the tiles uniformly.
-
First ensure the pipe, and then paste, and the bathroom floor should be waterproof.
Lay the wall tiles first, then the floor tiles.
The general practice of the decoration company or the construction party is to lay the wall tiles first, then pave the floor tiles, and pave the floor tiles after the wall tiles are paved, which will not affect the wall tiles and do not delay the construction period, so the general construction party will adopt this approach. If the floor tiles are paved first, and then the wall tiles are paved, you must wait for the tiles to dry and solidify and then pave the wall tiles, if the floor tiles are not completely dry, you will directly pave the wall tiles, step on the floor tiles, which will artificially cause the hollowing, loosening and height inequality of the tiles! >>>More
First wall tiles and floor tiles.
But a kind suggestion: the water pipe must be protected by a brick clamp. >>>More
After the tiles are paved first, the installation, commissioning, fixing and use of the finished toilet are carried out; >>>More
Explain what your base layer (the material that wraps the pipe) is. If it is a cement board, it is recommended to use structural adhesive or hanging net, cement mortar and other methods.
The general exhaust holes do not need to be tiled on the top of the ceiling, so they can be punched first or then punched, which does not affect.