The kitchen first hangs the ceiling or installs the range hood first

Updated on Kitchen 2024-06-23
4 answers
  1. Anonymous users2024-01-24

    1. All the ceilings are installed first, of course, the smoke machine pipe can be installed in advance at the same time as installation. There is no problem with this, even if you install the ceiling after the installation of the smoke machine, because the gusset is a small piece, so each piece can be removed, and later in the installation, when the master will take down a small piece directly above according to the installation position of the smoke machine, and draw a circle to walk the smoke pipe so that it is more beautiful.

  2. Anonymous users2024-01-23

    Hello! The cabinets should be installed later, and the ceiling should be suspended first, but the location of the range hood should be determined first, and the master of the ceiling will install the smoke exhaust pipe of the range hood. In this way, it will be more convenient for the workers to work, and it can also avoid the dust and bumps of the range hood.

  3. Anonymous users2024-01-22

    After laying the ceiling line, install the range hood and then install the ceiling.

  4. Anonymous users2024-01-21

    Install the kitchen ceiling first, and then remove the corresponding gusset when installing the range hood. Install the ceiling first, of course, you can pre-install the smoke pipe at the same time as installation. There is no problem with this, even if you install the ceiling after the installation of the smoke machine, carry the bright because the gusset is a small piece, so each piece can be removed, later in the installation, when the master will be according to the installation position of the smoke machine, take off a small piece directly above, draw a circle to walk the smoke pipe so that it is more beautiful.

    Precautions for installing kitchen staring bridge ceilings.

    1. When choosing materials, we should pay attention to the three proofs, namely waterproof, fireproof and moisture-proof. Therefore, it is generally not recommended to use wooden keels. At present, aluminum gusset is commonly used in home decoration, which can basically overcome the shortcomings of PVC plates such as discoloration, aging, and easy breakage, and is also relatively resistant to dirt and easy to clean.

    2. Note that the aluminum-plastic panel with only one word difference from the aluminum gusset is very different from the aluminum gusset in terms of use effect. Because in the process of installing aluminum-plastic panels, it is necessary to use woodworking boards to support the bottom, but if the moisture-proof work is not done, the consequences will be unimaginable, so use it with caution!

    3. Clean it before installation, and wipe the walls of the pipes to be wrapped in to prevent mold.

    4. Drilling is never too deep, so as not to damage the original waterproof ability and embedded wires in the wall, so it is recommended to keep 3 to 4 cm wide when drilling.

    5. Open the vent, determine the position of the vent on the wall, and then open a round hole with a diameter of 105mm.

    6. Pay attention to the height, the height of the ceiling is also very important, if the height is not well controlled, it may make the whole space appear depressed or empty, so the height of the ceiling is generally controlled at about 15 cm. However, there are sometimes exceptions, so the choice of height depends on the height of the floor and the type of house.

    7. Be sure to ensure tightness, tightness is very important, and the installer also knows the importance of sealing. However, there may be irresponsible installers, so if time permits, it is recommended to supervise the work in person and emphasize to the master that it must be sealed well.

Related questions
3 answers2024-06-23

Now families generally install ceilings first, and then install range hoods, because the cabinets are not on the front stage, which will lead to size errors. The range hood and the cabinet are on together, it's okay! When installing, you need to remove a few pieces of the ceiling. >>>More

1 answers2024-06-23

Yes, it is generally necessary to install the range hood first, and then suspend the ceiling.

4 answers2024-06-23

Install the range hood and water heater first, and then hang the ceiling. >>>More

2 answers2024-06-23

Install the range hood first, and then install the sliding door.

5 answers2024-06-23

It should be installed at the same time, if you really have to install one of them first, it is better to install a range hood first.