What should I do if I find that the corner of the wall with water pipes has not been waterproofed in

Updated on Bathroom 2024-06-23
2 answers
  1. Anonymous users2024-01-24

    Bathroom waterproofing must be done before the decoration, if it has been decorated, you can only use waterproof paint to waterproof, but the effect is not so good, the specific steps are as follows:

    Stir the paint well, open the paint packaging barrel, and stir well with a stirrer for about 5 10 minutes until the material does not contain agglomerates and does not precipitate. According to the waterproof practice of the bathroom, mechanical mixing is generally used, and manual mixing should not be used.

    In accordance with the standard toilet waterproof practice, the first layer of coating film: the waterproof coating with a plastic or rubber scraper evenly painted on the surface of the base layer that has been coated with primer, the thickness is, to be uniform, the amount of scraping is appropriate, the operation is in accordance with the bathroom waterproof construction plan first wall and then the ground, from the inside to the outside of the retreat operation, coating should be as uniform as possible, can not have local deposition, do not leave bubbles, and the bond is tight. When used on a wet or non-absorbent base layer, there is no need to lay the bottom layer.

    THE WATERPROOF LAYER SHOULD EXTEND FROM THE GROUND TO THE WALL, 250MM ABOVE THE GROUND The height of the waterproof layer on the wall of the bathroom near the shower head shall not be less than 1800MM.

    When the first layer of coating film is solidified to non-sticky hands, the second coating film waterproof construction is carried out according to the first material construction method. In order to make the thickness of the coating film uniform, the direction of scraping must be perpendicular to the direction of the first scraping, and the amount of scraping is slightly less than that of the first pass, and the thickness is appropriate.

    THE WATERPROOF LAYER OF THE COATING FILM IS EVENLY PAINTED, AND THE GENERAL THICKNESS SHALL NOT BE LESS THAN 1 5MM, ESPECIALLY FOR FAÇADE CONSTRUCTION, ONE OR MORE LAYERS CAN BE ADDED. When adding non-woven fabrics, the lower coating and upper coating should be continuously constructed, and the non-woven fabrics should be paved straight, and brushed with a brush without leaving a hollow drum.

    The waterproof surface of the coating film is not blistering, does not flow, is smooth and has no concave and convex, and the joints of pipe fittings, sanitary ware feet, floor drains, and drainage outlets are tight, and the end is smooth and non-leaking.

    The bathroom waterproof construction plan finally requires that a 24-hour closed water test must be done after the waterproof project is completed.

    — Guiyang florist decoration.

  2. Anonymous users2024-01-23

    1. Reason: The toilet uses a large amount of water, if the slope is not too good, and there are gaps in the floor tiles, when using water, the water seeps into the cement mortar layer above the waterproof layer below the floor tiles, and when the water in this layer is saturated, it seeps out from the bathroom door.

    Second, maintenance methods: clean up all tile gaps, keep dry and dust-free, use ceramic tile grout to hook once, the junction of wall tiles and floor tiles, the junction of floor tiles and floor drains with glass glue or plugging spirit sealing, spray waterproof penetrant full spray 1-2 times, dry can be used. After 1-2 years, it needs to be repaired or rebuilt.

Related questions
4 answers2024-06-23

If it is slight, you can cut all the brick gaps (the former hook joints) with a blade, and then pour it in with a plugging agent, and if it is too serious, you can only dismantle it and start over.

10 answers2024-06-23

1. First of all, clean the bathroom, use a mop to absorb the water, and then use a rag or paper towel to absorb the stagnant water in the cracks. >>>More

1 answers2024-06-23

If there is space, generally the gas water heater is installed in a place other than the bathroom, and the bathroom wall is installed with a hot water pipe. If there is no original, it is necessary to re-embed, and the original wall needs to be destroyed, which is more troublesome. Another way is to install open pipes, but the overall appearance is not good.

3 answers2024-06-23

Set up a screen at the door or hang a curtain at the door of the bathroom.

1 answers2024-06-23

Jiangsu Yangzhou Haoyang waterproof latest products: kitchen and bathroom waterproof guard (free from smashing tile waterproof): for bathroom infiltration, construction instructions: >>>More