How to do waterproofing in the bathroom of the Quality Supervision Bureau

Updated on Bathroom 2024-06-15
1 answers
  1. Anonymous users2024-01-24

    Toilet waterproofing practices:

    1. Ground treatment.

    Be sure to level the ground before applying waterproofing. Screed construction method: if there are voids, cracks and unequal defects on the base surface, repair and smooth with cement mortar.

    The base surface must be firm, flat, clean, free of dust, greasy, wax, release agent, etc., and other debris substances. The construction of the waterproof layer can only be carried out after the screed is dry, and the construction should be fireproof and waterproof during the construction. After the waterproof layer is completed, the finished product should be protected, and no one should walk around.

    2. Wall treatment.

    About 300mm high waterproof paint should be used for wall treatment to prevent water from penetrating the wall and returning moisture.

    The painting height between the wall and the floor (plane and façade) of the bathroom should be greater than 100mm.

    If there is a shower in the bathroom, the waterproof height of the room is not less than 1800mm.

    If there is a bathtub, the waterproof height of the wall adjacent to the bathtub should be 300mm higher than the bathtub.

    The waterproof height of the bathtub is not less than 800mm.

    The waterproof height of the squatting pit should exceed the ground of the squatting platform by 400mm.

    For the light wall of the bathroom renovation and the self-built light wall, it is recommended that the waterproof height should be at the top.

    3. Do a closed water test.

    After the waterproofing construction is completed, the water storage test is carried out. Block all the drains in the bathroom, build a water barrier about 200mm high at the door, and then pour about 20mm 30mm deep water into the bathroom, and check whether there is leakage on the surrounding walls and the ground after 24 hours, the waterproof experiment is the key to ensure the quality of the bathroom waterproof project, and it must be done. If there is no leakage after more than 24 hours, it is considered qualified.

    If water leakage is found, the water storage test should be stopped immediately, the waterproof layer should be re-improved, and the water storage test should be carried out after the treatment is qualified.

Related questions
7 answers2024-06-15

Bathroom waterproofing practices What is it, how to do the bathroom waterproofing, how to do the bathroom waterproofing, these issues are more concerned about the owners. Tuba Rabbit will solve your doubts and introduce the practice of bathroom waterproofing. >>>More

8 answers2024-06-15

Toilet waterproofing practices:

Basic material selection: new waterproof materials such as cement mortar, old ones such as acrylic are commonly used toilet waterproof materials. We should choose based on the principles of easy construction, environmental protection and good quality. >>>More

5 answers2024-06-15

The supervision of Xiaomi's home decoration reminds you that the waterproof construction of the bathroom must be installed and implemented in the waterproof construction specification to reduce the trouble of water leakage and water seepage in the bathroom in the future. The waterproof height of the toilet can be determined according to the specific needs of the user. >>>More

3 answers2024-06-15

The first step, before the waterproof treatment of the bathroom, the first thing is to level the floor level of the bathroom, the ground is uneven, when the waterproof paint is painted, it may be uneven, or the ground is easy to crack because of unevenness, which will crack with the ground even if the waterproof paint is applied. >>>More

1 answers2024-06-15

1. The specific process of bathroom waterproofing:

1. Brush the waterproof paint for the first time. Before construction, it is necessary to ensure that the ground is dry, and the waterproof coating should be coated with no omission, firmly combined with the base layer, no cracks, no bubbles, and no falling off. The coating height is consistent, and the thickness should meet the requirements of the product. >>>More