The bathroom just did play waterproofing, and after a while, there was a small puddle of water on it

Updated on Bathroom 2024-06-15
1 answers
  1. Anonymous users2024-01-24

    It's that the waterproofing is not handled on the top, and you have to do it on the top, and no matter how thick the waterproofing is brushed below, it is all for nothing.

Related questions
3 answers2024-06-15

Either it is something black that has been wiped or a black stain formed by mold that has been created by a humid environment. >>>More

1 answers2024-06-15

Do waterproofing needs to be done on the surface of the water, dig excellent permeability crystalline waterproofing, you can do it yourself on the cement surface with a super permeable waterproof guard (if there are cracks and potholes on the cement surface, fill the complete with metin porcelain glue and then do waterproofing). >>>More

11 answers2024-06-15

It is a very important process to do toilet waterproofing, and waterproof construction should be coated with waterproof waterproof The performance of waterproof materials should meet the provisions of the current national standards, and there should be a product qualification certificate; The surface of the base should be smooth, and there should be no defects such as hollowing, sanding, cracking, etc., and the moisture content of the base should meet the construction requirements of waterproof materials; THE WATERPROOF LAYER SHOULD EXTEND FROM THE GROUND TO THE WALL, 250MM HIGHER THAN THE GROUND, AND THE HEIGHT OF THE WATERPROOF LAYER ON THE WALL OF THE BATHROOM NEAR THE SHOWER HEAD SHALL NOT BE LESS THAN 1800MM; THE WATERPROOF LAYER OF THE COATING FILM IS EVENLY BRUSHED, THE GENERAL THICKNESS SHALL NOT BE LESS THAN 1 5MM, THE WATERPROOF SURFACE OF THE COATING FILM IS NOT BLISTERING, NOT FLOWING, SMOOTH AND CONVEX, AND THE JOINTS OF PIPE FITTINGS, SANITARY WARE FEET, FLOOR DRAINS, AND DRAINAGE OUTLETS ARE TIGHT, AND THE END IS SMOOTH AND DOES NOT LEAK After the waterproof project is completed, it is necessary to do a 24-hour water storage experiment. >>>More

12 answers2024-06-15

The first floor is the kitchen to the compartment, and it is okay to have a bathroom above, you just need to do a good job of waterproofing it, so as not to leak it out.

2 answers2024-06-15

Menstrual blood should also be blackened, and something like flesh should be menstrual blood clots, just drink something warm to let the menstrual blood go down.