The kitchen should be tiled first or the countertop should be made first

Updated on Kitchen 2024-06-28
6 answers
  1. Anonymous users2024-01-24

    After the wall and floor tiles of the kitchen are pasted, the ceiling is finished (or the ceiling elevation is determined) before the cabinet can be made.

    This refers to the fact that it is made in-house. If the finished cabinet of the manufacturer needs to be preliminarily designed before construction.

    If you do it yourself, it is the brick paste and then make the cabinet, if the custom is to enter the field to measure the size, out of the water and electricity map, after the brick is pasted and then re-ruler, out of the design drawing, almost your home brick pasted, the ceiling is also installed, and finally install the cabinet.

  2. Anonymous users2024-01-23

    If you do it yourself, it is the brick paste and then make the cabinet, if the custom is to enter the field to measure the size, out of the water and electricity map, after the brick is pasted and then re-ruler, out of the design drawing, almost your home brick pasted, the ceiling is also installed, and finally install the cabinet.

  3. Anonymous users2024-01-22

    Stick the stove to the wall.

    Staple the door panel and order the countertop.

    Install the countertop and install the door panel.

  4. Anonymous users2024-01-21

    I don't know if you're in a domestic or commercial kitchen. The normal procedure is to design the plan first, set the location of the water and electricity, and then construct, because if the bricks are pasted, it will be very troublesome to change the sockets, wiring, water supply, exhaust and so on. As for the construction, it is generally the first to paste the bricks and then make the countertop.

  5. Anonymous users2024-01-20

    You must have put the bricks first, you can't make the countertop first in order to save that bit of bricks, right?

  6. Anonymous users2024-01-19

    Tile Otherwise, how do you post it on the platform? . .

Related questions
1 answers2024-06-28

Paste the bricks first, and the cabinets should be on the wall tiles, floor tiles, and the ceiling will be completed before entering the site.

1 answers2024-06-28

Generally speaking, the cabinets are set first, and then the tiles are paved. >>>More

3 answers2024-06-28

The installation of kitchen countertops generally belongs to the wet work of civil engineering, which should be done first. But if you choose to order the finished product, take it to assemble, you have to make it later.

9 answers2024-06-28

You can paste most of the bricks, leave the edge of the door, and close the edge after installing the door.

2 answers2024-06-28

Stick the floor tiles first, the kitchen is a more humid space, first paste the floor tiles and then press the floor tiles with the wall tiles to avoid the emergence of water flowing out with the gaps in the floor tiles and breeding bacteria.