Install water and electricity in the bathroom first or tile first?

Updated on Bathroom 2024-06-18
1 answers
  1. Anonymous users2024-01-24

    First inside and then outside, the pipes in the wall are laid first, then tiled, and finally the pipes outside the wall are laid.

Related questions
2 answers2024-06-18

You should put tiles first, and then choose the toilet, which is a correct installation procedure, and will also get a good decoration for the bathroom in your home.

1 answers2024-06-18

Hello, the bathroom decoration is first bricked in the door, because after the bricks are pasted, you can know that you actually know the special height size, and it is also more beautiful.

1 answers2024-06-18

After the tiles are paved first, the installation, commissioning, fixing and use of the finished toilet are carried out; >>>More

3 answers2024-06-18

Lay the wall tiles first, then the floor tiles.

The general practice of the decoration company or the construction party is to lay the wall tiles first, then pave the floor tiles, and pave the floor tiles after the wall tiles are paved, which will not affect the wall tiles and do not delay the construction period, so the general construction party will adopt this approach. If the floor tiles are paved first, and then the wall tiles are paved, you must wait for the tiles to dry and solidify and then pave the wall tiles, if the floor tiles are not completely dry, you will directly pave the wall tiles, step on the floor tiles, which will artificially cause the hollowing, loosening and height inequality of the tiles! >>>More

1 answers2024-06-18

Tile first. Toilets are now glued to the floor tiles with glass glue.