Civil engineering secondary structure, I only see the kitchen and bathroom in the general descriptio

Updated on Kitchen 2024-06-05
3 answers
  1. Anonymous users2024-01-24

    Waterproof guide wall refers to the filling of the root of the wall on the surface of the floor structure.

    The window edge you mentioned is a window edge reinforced frame, which is mainly used to fix the window frame and prevent cracks on the window edge when installing the window frame.

  2. Anonymous users2024-01-23

    There must be a guide wall by the window! It's a waterstop!

  3. Anonymous users2024-01-22

    Flip the water. It's not surprising that there is a flange in the area where it is easy to seep water.

Related questions
2 answers2024-06-05

Hello, whether there is a waterstop under the exterior wall of the balcony of the secondary structure of the building. Some non-load-bearing masonry, structural columns, lintels and other parts that need to be completed before decoration in frame, shear wall and frame shear engineering are called secondary structures. The process time of the secondary structure is constructed after the completion of the construction of the primary structure (referring to the load-bearing member part of the main structure), which is relative to the load-bearing structure, and is a non-load-bearing structure, and the maintenance structure, such as structural columns, ring beams, water-stopping anti-beams, parapet walls, roof-pressing walls, infill walls, partition walls, etc.

2 answers2024-06-05

If you want to decorate the balcony, there are a lot of balcony decoration renderings on the decoration gallery network, choose your favorite style, and you will know how to decorate.

1 answers2024-06-05

The secondary structure does not include balcony railings, only balconies and wall columns.

1 answers2024-06-05

Generally, the balcony is half of the construction area, and the secondary structure of the balcony line is not considered as the area, and should be included in the construction area.

1 answers2024-06-05

The toilet should be poured in situ together with the floor slab to ensure that there is no water seepage.