-
The toilet should be poured in situ together with the floor slab to ensure that there is no water seepage.
The secondary structure does not include balcony railings, only balconies and wall columns.
If you want to decorate the balcony, there are a lot of balcony decoration renderings on the decoration gallery network, choose your favorite style, and you will know how to decorate.
General cold seam treatment method:
1.Surface retouching method. >>>More
There is no problem with the second gluing.
However, in general, an anti-mold sealant is used. >>>More
In the frame independent column basic structure, some ground beams are located below the ground floor, and there is no floor slab on the first floor, in order to prevent the ground from sinking, we usually deal with the brick wall on the ground beam to the bottom of the ground floor, and this wall is called "ground ridge wall". >>>More