It is best to hang a layer of glass lead mesh for better results.
-
After the waterproof layer is dry, the water storage height is slightly lower than the doorway, and the closed water test is at least 48 hours. Of course, the longer the better. Make sure that there is no leakage or seepage downstairs before you can backfill the muck in the bathroom.
The waterproof layer needs to be filled with fine sand. After the muck is filled, make a screed layer with mortar, 2 to 3 cm. Then apply a layer of waterproof paint to this screed.
After drying, you can directly put the brick.
The bathroom wall needs to be waterproofed, because the wall of the bathroom will have a lot of splashes in the process of our shower, if you don't do a good job of waterproofing, not only will there be water seepage problems, the wall may also have hair mildew, very ugly, so how to do the bathroom wall waterproof? >>>More
Two coatings for waterproofing toilets.
Nowadays, the materials used for waterproofing are generally paints, and asphalt-based waterproofing coatings are basically not used. Here are two coatings commonly used for waterproofing in the bathroom. >>>More
1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More
It is enough to do a layer of brushing effect, for many reasons, such as the type of paint, or the mixing of cement and sand.
Not feasible, it needs to be painted twice.
Bathroom waterproofing process: >>>More