    1 All 1Usually the ground is a cement mortar surface, and there are some special circumstances, such as the pipeline is not buried, the ground is uneven, so the base should be smooth, the surface should be smoothed and calendered, solid, there shall be no hollowing, sanding, cracking and other phenomena, the moisture content of the base layer should meet the construction requirements of waterproof materials, not greater than 9.

    2.The flooding slope of the screed layer should be 2, and the slope of 5 (1 20) should be erased at the root of the pipe against the wall to avoid water accumulation here.

    3.Pipe roots and floor drains that protrude from the floor and walls. Drains, yin and yang angles and other parts that are prone to leakage should be treated with local special plugging.

    4.Stir the paint well, open the paint packaging barrel, and stir well with a stirrer for about 5 10 minutes until the material does not contain agglomerates and does not precipitate. Generally, mechanical mixing is used, and manual mixing is not appropriate.

    5.The first layer of coating film: the waterproof coating is evenly scraped on the surface of the base layer that has been coated with primer with a plastic or rubber scraper, the thickness is, to be uniform, the amount of scraping is appropriate, the operation of the wall first and then the ground, from the inside to the outside of the operation, the coating should be as uniform as possible, there can be no local deposition, no bubbles, and the bond is tight.

    When used on a wet or non-absorbent base layer, there is no need to lay the bottom layer.

    6.THE WATERPROOF LAYER SHOULD EXTEND FROM THE GROUND TO THE WALL, 250MM ABOVE THE GROUND The height of the waterproof layer on the wall of the bathroom near the shower head shall not be less than 1800MM.

    7.When the first layer of coating film is solidified to non-sticky hands, the second coating film waterproof construction is carried out according to the first material construction method. In order to make the thickness of the coating film uniform, the direction of scraping must be perpendicular to the direction of the first scraping, and the amount of scraping is slightly less than that of the first pass, and the thickness is appropriate.

    8.THE WATERPROOF LAYER OF THE COATING FILM IS EVENLY PAINTED, AND THE GENERAL THICKNESS SHALL NOT BE LESS THAN 1 5MM, ESPECIALLY FOR FAƇADE CONSTRUCTION, ONE OR MORE LAYERS CAN BE ADDED. When adding non-woven fabrics, the lower coating and upper coating should be continuously constructed, and the non-woven fabrics should be paved straight, and brushed with a brush without leaving a hollow drum.

    9.The waterproof surface of the coating film is not blistering, does not flow, is smooth and has no concave and convex, and the joints of pipe fittings, sanitary ware feet, floor drains, and drainage outlets are tight, and the end is smooth and non-leaking.

    10.After the waterproofing project is completed, a 24-hour closed water test must be done.

  2. Anonymous users2024-01-23

    Your uneven base surface definitely needs to be leveled first, and then you can use mortar waterproofing agent to do waterproofing.

Related questions
5 answers2024-06-24

Bathroom waterproofing practices What is it, how to do the bathroom waterproofing, how to do the bathroom waterproofing, these issues are more concerned about the owners. Tuba Rabbit will solve your doubts and introduce the practice of bathroom waterproofing. >>>More

7 answers2024-06-24

Bathroom waterproofing practices What is it, how to do the bathroom waterproofing, how to do the bathroom waterproofing, these issues are more concerned about the owners. Tuba Rabbit will solve your doubts and introduce the practice of bathroom waterproofing. >>>More

8 answers2024-06-24

Toilet waterproofing practices:

Basic material selection: new waterproof materials such as cement mortar, old ones such as acrylic are commonly used toilet waterproof materials. We should choose based on the principles of easy construction, environmental protection and good quality. >>>More

5 answers2024-06-24

The supervision of Xiaomi's home decoration reminds you that the waterproof construction of the bathroom must be installed and implemented in the waterproof construction specification to reduce the trouble of water leakage and water seepage in the bathroom in the future. The waterproof height of the toilet can be determined according to the specific needs of the user. >>>More

3 answers2024-06-24

The first step, before the waterproof treatment of the bathroom, the first thing is to level the floor level of the bathroom, the ground is uneven, when the waterproof paint is painted, it may be uneven, or the ground is easy to crack because of unevenness, which will crack with the ground even if the waterproof paint is applied. >>>More