How much does it cost to make two or three square meters of waterproofing in a general bathroom

Updated on Bathroom 2024-06-15
1 answers
  1. Anonymous users2024-01-24

    It also depends on the material, for example: K11 cement-based waterproof mortar (general-purpose) * 20 kg barrel, dosage: kilogram square meter layer, that is, each barrel can be constructed 7-10 square meters, selling price: 298 yuan barrel.

    High-performance mortar waterproofing agent * 20 kg barrel, dosage: when the thickness of the waterproof layer is 10 mm, after mixing the cement mortar in proportion to each barrel, 8 square meters can be constructed, and the selling price: 158 yuan barrel.

    For specific use and price, please refer to the instructions for use of the product.

Related questions
1 answers2024-06-15

Do waterproofing needs to be done on the surface of the water, dig excellent permeability crystalline waterproofing, you can do it yourself on the cement surface with a super permeable waterproof guard (if there are cracks and potholes on the cement surface, fill the complete with metin porcelain glue and then do waterproofing). >>>More

10 answers2024-06-15

Waterproof materials mainly include: polyurethane, acrylic, polymer, polymer, cement, mortar. Generally about thirty a square.

2 answers2024-06-15

The material cost depends on which waterproof material you choose, the general bathroom is waterproofed with cement-based waterproof coating, and the tiles are paved on this waterproof coating, which can effectively prevent the hollowing of the tile and the shelling of the adhesive layer. It is recommended that the material cost be calculated according to the amount used, about 30 yuan per square meter, which should not be considered saving, and the quality and effect are the main things; Paint twice, the labor cost can be completely done by one person in a day, you can calculate your local labor cost.

10 answers2024-06-15

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

11 answers2024-06-15

It is a very important process to do toilet waterproofing, and waterproof construction should be coated with waterproof waterproof The performance of waterproof materials should meet the provisions of the current national standards, and there should be a product qualification certificate; The surface of the base should be smooth, and there should be no defects such as hollowing, sanding, cracking, etc., and the moisture content of the base should meet the construction requirements of waterproof materials; THE WATERPROOF LAYER SHOULD EXTEND FROM THE GROUND TO THE WALL, 250MM HIGHER THAN THE GROUND, AND THE HEIGHT OF THE WATERPROOF LAYER ON THE WALL OF THE BATHROOM NEAR THE SHOWER HEAD SHALL NOT BE LESS THAN 1800MM; THE WATERPROOF LAYER OF THE COATING FILM IS EVENLY BRUSHED, THE GENERAL THICKNESS SHALL NOT BE LESS THAN 1 5MM, THE WATERPROOF SURFACE OF THE COATING FILM IS NOT BLISTERING, NOT FLOWING, SMOOTH AND CONVEX, AND THE JOINTS OF PIPE FITTINGS, SANITARY WARE FEET, FLOOR DRAINS, AND DRAINAGE OUTLETS ARE TIGHT, AND THE END IS SMOOTH AND DOES NOT LEAK After the waterproof project is completed, it is necessary to do a 24-hour water storage experiment. >>>More