The construction has started, and the ground is drained, can you lay a solid wood floor on it?

Updated on Solid wood 2024-06-21
1 answers
  1. Anonymous users2024-01-24

    1. All need to hit the keel over the water pipe.

    Then the paving will do, and the water pipes will be fixed with clips.

    It is best to groove the ground and reduce the height of the water pipe appropriately.

Related questions
1 answers2024-06-21

The general paint dries in 2-3 days, and after three days it can be reheated.

1 answers2024-06-21

The water heater you are talking about is an electric water heater or a gas water heater, if it is an electric water heater, there should be no problem with covering or wrapping something.

2 answers2024-06-21

Now the floor tiles are basically dry paving, and the original floor tiles have little impact, but this will increase the elevation of the ground surface by a few centimeters, which will have an impact on the height of the door, the ground elevation outside the bathroom, and the toilet drain. There is no problem with laying floor tiles on the floor tiles, but there are many problems to pay attention to when laying wall tiles on the wall tiles! If you lay floor tiles on the floor tiles, because the surface of the lower bricks is relatively smooth, it cannot be glued firmly with ordinary cement sand, and it must be pasted with a special tile adhesive! >>>More

1 answers2024-06-21

There are such, installed in the basement, there is a hoist pump to the heights.

3 answers2024-06-21

The effect of imitation shirt is to be:

The floor is thick, and the feet feel softer when walking on it, and at the same time, it can reflect the color of the material of the green bricks below. >>>More