After doing the central air conditioning, suspended ceiling, floor heating, the entrance aisle is on

Updated on Suspended ceilings 2024-06-09
2 answers
  1. Anonymous users2024-01-24

    It's okay to do it so high, try not to do a flat top.

  2. Anonymous users2024-01-23

    The air conditioner is partially suspended, and there will be no feeling of depression after installing the lights.

Related questions
1 answers2024-06-09

[Shijia.com]: Now the thickness of the ultra-thin indoor unit of the central air conditioner can be reduced to 200mm. The maximum height of the ceiling to be occupied is about 300mm. >>>More

2 answers2024-06-09

The concept of the reserved size of the ceiling is inaccurate and the procedure is wrong. The central air conditioning unit should be installed first, and then the ceiling should be used to package and hide the internal unit. AT PRESENT, THE THICKNESS OF THE MACHINE ON THE MARKET IS DAMAGED BY THE HOME INSTALLATION MACHINE, AND THE HEIGHT OF THE CEILING NEEDS TO BE 280MM, AND THE AVERAGE HOME CAN DO 300MM. >>>More

1 answers2024-06-09

Pay attention to reserve the maintenance port and do the movable ceiling as much as possible. >>>More

3 answers2024-06-09

It is to inform the designer first that you need to do central air conditioning. Experienced designers will consider the reservation of central air conditioning when making a ceiling for you. Then the top drawing from the designer is delivered to the air conditioning company. It is up to them to communicate with the construction party. >>>More

3 answers2024-06-09

Since it has been adjusted to 23cm, then use this size, there is no problem. >>>More