My bathroom did not pour water for half a month, and the water leakage downstairs came to us, and th

Updated on Bathroom 2024-06-15
3 answers
  1. Anonymous users2024-01-24

    It's a leak in the bathroom, and the waterproof layer needs to be redone.

  2. Anonymous users2024-01-23

    It is very simple that after the surface layer is removed, if it is found that the cause of water seepage is not caused by your home, the property management company and the downstairs owner will bear the maintenance costs incurred by your home due to the demolition.

    If it is determined that the leak is caused in your home after demolition, then you are responsible for repairing it.

  3. Anonymous users2024-01-22

    No matter what the cause of the water leakage, it has nothing to do with the property, because the property only provides maintenance services for security, cleaning, greening and public facilities and equipment.

    The judgment is very simple, as long as you are sure that there is no water leak in the upstairs of your house, you can basically conclude that the water leakage in the downstairs of your house is caused by yourself.

    There are two situations of floor heating water leakage: first, water leakage at the hot melt interface and valve, and second, water leakage from the pipe itself.

    Because when laying floor heating, the most taboo is the pipe, so the floor heating pipe is basically a pipe without an interface, only in the place of the valve, and after laying, it is necessary to press to see if the leakage is not leaking, if it does not leak at that time, you can basically determine that the pipe will not leak because of the damage when laying, and there will be water leakage in the future, many of which are problems with the interface and valve (both places are exposed).

    People or units with no qualifications will test this test, and it is best to find a professional master to suppress you and test the water.

Related questions
1 answers2024-06-15

This fragmentation was clearly caused by impact. It is the cause of external force.

16 answers2024-06-15

The closed water test of the roof and bathroom needs to be done after the waterproof layer is completely dry, and the drying time of the waterproof layer will be slightly different depending on the waterproof material used, the weather during construction, etc. >>>More

2 answers2024-06-15

There are two main reasons why the waterproof coating has not dried for half a month: one is that the base layer is not dry before waterproof painting, and the other is that the waterproof is not painted in batches, resulting in its slow drying. No matter what the situation is, it will affect the use of waterproofing, and it is recommended to find a professional supervisor to check it.

2 answers2024-06-15

Generally, not.

After the waterproof construction of the bathroom is completed, the closed water test is done first, and the wall is sprayed with water, and the construction can be continued only if it is qualified. >>>More

3 answers2024-06-15

It won't burn out, but sometimes it will go on strike if it gets too long and overheats. It's just that the connection is normal, but there is no packet, and after a while, it is normal. This is still relatively normal, like the fan in our dormitory is not turned off all summer, from morning to night, it will not be broken without a break, in fact, the service life is quite long, you don't need to have these worries, there is really no problem, it is recommended that you can refer to it, I hope it can help you.