It s been half a month since the bathroom was waterproofed, but it s still not dry, can you test the

Updated on Bathroom 2024-04-02
2 answers
  1. Anonymous users2024-01-23

    There are two main reasons why the waterproof coating has not dried for half a month: one is that the base layer is not dry before waterproof painting, and the other is that the waterproof is not painted in batches, resulting in its slow drying. No matter what the situation is, it will affect the use of waterproofing, and it is recommended to find a professional supervisor to check it.

  2. Anonymous users2024-01-22

    Generally, as long as the waterproof layer can be completely dried for about 24 hours, and then you can do closed water, and it has not dried for so long, is there a problem with the waterproof material you bought.

Related questions
16 answers2024-04-02

The closed water test of the roof and bathroom needs to be done after the waterproof layer is completely dry, and the drying time of the waterproof layer will be slightly different depending on the waterproof material used, the weather during construction, etc. >>>More

1 answers2024-04-02

This fragmentation was clearly caused by impact. It is the cause of external force.

2 answers2024-04-02

The key is what material is used for waterproofing.

2 answers2024-04-02

If you have a problem with your blood pressure, go to the hospital to have your blood pressure checked, and prescribe some medicine. Pay attention in life.

3 answers2024-04-02

First of all, the wall outside the bathroom is damp, peeling and other phenomena, most of which are caused by water leakage, and now you need to find the cause of the water leakage first >>>More