The floor tiles of the bathroom were smashed, and the sand was full of water, and the walls of the t

Updated on Bathroom 2024-06-26
2 answers
  1. Anonymous users2024-01-24

    1. If all the bathroom waterproofing is not done, it must be waterproofed when redecorating.

  2. Anonymous users2024-01-23

    The waterproofing measures were not done well when the bathroom was renovated.

    It is better to renovate and renovate it as a remedy.

    Floor tiles should also be elegant, the bathroom is a water environment, the need for tiles with low water absorption, you can go to see Yipai tiles are quite good.

Related questions
5 answers2024-06-26

The salary is generally according to the square The price may be different in each place Ask a few more people to talk about the price Smashing the floor tiles will not cause damage to the residents downstairs The key is that you must do a good job of waterproofing when you resurface the floor tiles Do a good job of waterproofing to release water to do experiments See if the water leaks downstairs. . .

1 answers2024-06-26

As long as there are no problems with the piping system. It can be treated with --- cologne fine seam glue. It works great! All tile joints are treated and fully transparent after drying. Good value for money!

4 answers2024-06-26

New urine stains on the tiles can be washed off with water, and if they are old, they can be scrubbed with a warm laundry detergent (or soap) solution or light ammonia, or borax solution, and then rinsed with water. All kinds of ceramic tile stain treatment skills: 1, glazed tile pollution cleaning method: >>>More

1 answers2024-06-26

Dream about a pit in the bathroom full of water - Dream interpretation: >>>More

2 answers2024-06-26

It is caused by the destruction of the previous waterproofing layer during rework, and it needs to be reworked or the wall will soon break.