-
1. As long as you determine the location of the water you need, the water and electricity workers will help you drain the water pipes.
Generally do not enter from the door, from the construction process of the bathroom is a long-term water location, pipes are not conducive to waterproofing. Historically, most of the causes of water seepage at the door of the bathroom are due to plumbing problems. If you have more questions, you can click on ID to consult.
Waterproofing and the layout of waterways in toilet waterway renovation should be done first and then waterproofing. If the waterproofing is done first, then the waterproof layer will still be damaged if the pipeline is reconstructed. >>>More
First, I think it is enough to bury 3 centimeters, because it is necessary to lay tiles, so there is no problem with adding the thickness of cement. >>>More
1,000 yuan is really not enough to buy new materials for regular construction.
The pressure should be a barometric test, to see if the pressure is relieved, and the experiment can be requested.