Are the technical regulations for waterproof construction of kitchens and toilets common across the

Updated on Kitchen 2024-05-03
1 answers
  1. Anonymous users2024-01-23

    Yes, but professional construction is recommended to do waterproofing. For example, use the plugging treasure to treat the R angle of the root of the yin corner pipe, and the bottom layer is coated with polyurethane, and the material should be made of national standard.

Related questions
4 answers2024-05-03

1. The waterproofing of the kitchen floor should first be swept flat with cement mortar, and then brushed with flexible waterproof materials. The waterproof layer on the ground is brushed three times in order to better achieve the waterproof effect. >>>More

4 answers2024-05-03

24 hours.

The closed water test, also known as the water storage test, should be filled with water, and the water should have a sufficient volume. The water storage depth of the water storage test should not be less than 20mm, the water storage height is generally 30-100mm, the water storage time is 24 hours, and the water surface has no obvious drop to be qualified. This test is generally done on the roof, bathroom or room with waterproof requirements. >>>More

5 answers2024-05-03

24 hours, after the waterproof layer is made, wait until the material is dried to the specified time, and do a closed water test. >>>More

2 answers2024-05-03

This tile adhesive is really magical, I use a liquid tile adhesive called Yucan tile adhesive at home, the bonding strength is really incomparable, and then there is no problem with drilling holes on the tile, the general normal construction is to do brushing on the waterproof tile, if you want to stick firmly, you can apply a layer of adhesive on the waterproof without brushing. Hopefully this answer is satisfactory.

9 answers2024-05-03

I don't know what material you use, but now your situation can be divided into the following ones: >>>More