Questions about waterproofing construction in the bathroom?

Updated on Bathroom 2024-05-03
2 answers
  1. Anonymous users2024-01-23

    We must not try to save trouble and cheap, if we do not do a good job, we will pay a greater price in the future. Generally, the leak plugging treasure is used to do the yin angle treatment, and then the ground is used with the brand of polyurethane waterproof coating, and then the closed water experiment is done. If there is no water leakage, you can make a cement protective layer on it.

    After it is done, you can use waterproof mortar to make the wall waterproof, and it is best to do the top. Then do the ground waterproofing mortar. After the tiles are pasted, caulk them with a super anti-fouling caulk. Call it a day.

  2. Anonymous users2024-01-22

    The waterproofing membrane is rolled up to the ground and wall at one time.

Related questions
4 answers2024-05-03

The waterproof paint is brushed three times, and the bathroom wall should be brushed to a meter high. Brush the floor drain and drain around it several times, and do a 24-hour closed water test after doing it, and you can lay the floor tiles if there is no water leakage. If you paint part of the kitchen, you can paint around the floor drain if there is a floor drain, paint the meter height around the vegetable sink, if you want to paint all of them, the floor is also painted 3 times, and the wall can be painted 60 cm high.

7 answers2024-05-03

PPR dark tube 35 is about 40, and the dark tube is slightly cheaper; Water resistant 35 to 45. >>>More

5 answers2024-05-03

Use CF-2000 high-efficiency composite waterproofing agent to seal the floor drain and the ground joint, and no leakage will occur. It is also not required to use any waterproof coating and the high and low standards of the floor drain to limit the practice of the floor drain.

3 answers2024-05-03

Seeing the problem upstairs, it must be a leak in the bathroom. >>>More

2 answers2024-05-03

It is required that the upper return part of the waterproof membrane is at least 500mm high, and the floor drain mouth should be evenly sloped from the ground, so as to ensure that the waterproofing around the floor drain and pipeline reserved mouth should be tight to avoid local water seepage.