My house was renovated at the end of December last year, and now the living room is cracked

Updated on Living room 2024-05-06
1 answers
  1. Anonymous users2024-01-23

    The reasons are none other than that:1'The quality of the cement is not up to standard 2'The living room generally has a large span, but for the sake of aesthetics, it is generally not necessary to add a secondary beam or anti-beam in the middle, but if you do not do double reinforcement (encryption additional reinforcement) and increase the thickness of cement (generally 13-15cm), it is easy to crack 3'Cracking caused by the settlement of the foundation.

Related questions
2 answers2024-05-06

In fact, the new home was completed last year, and today I suddenly turned to the photo and remembered to come out to show you. The new house is 80 square meters, and it took more than three months to decorate it, but fortunately, the area is not too big, and the style is also very simple, so the construction is not very complicated, and it is not very time-consuming. It took 100,000 yuan to design before and after, and the overall effect is very like, and the home is to this simple and warm design, and I like the cabinet in the dining room the most. >>>More

1 answers2024-05-06

Freshly renovated bathrooms should have been tested for plumbing pressure. If there is no problem with the drainage pipes, all tile joints can be treated with "cologne" fine seam glue.

3 answers2024-05-06

Alas... It's all a tragedy... If you look at the breakdown, there may be a bit of money for a taxi and food.

1 answers2024-05-06

The solution is as follows: scrape off the putty on the surface of the cracked surface, paste kraft paper or anti-crack bandage on the gypsum board splicing, and then scrape the putty to repair the paint again.

1 answers2024-05-06

Is it okay oh oh ( o ) oh oh ( o ) oh oh ( o ) oh