My bathroom was backfilled on the basis of the developer s asphalt waterproofing layer for the first

Updated on Bathroom 2024-05-02
1 answers
  1. Anonymous users2024-01-23

    Whether it is a ventilation pipe or a sewer pipe or a sewage pipe, you have to figure out whether the pipe is a PVC pipe or a PPR pipe, if it is PVC, find a section of pipe with the same diameter (mainly for the curvature), cut a piece slightly larger than the gap and polish the notch outward with sandpaper, and then use sandpaper to polish off the smooth surface with sandpaper, and then apply it with PVC special adhesive, and then stick that piece on. If it is PPR, find a PPR tube in the same way, use fire or other heating methods, heat the edge of the notch and the inside of the piece to a microscopic state, and then paste it and press it for a while, I hope it can help you.

Related questions
4 answers2024-05-02

My bathroom in the waterproof layer of the leather floor tiles under the seepage, seeping into the downstairs living room, the bathroom is all demolished, redone to drain water and decorate the floor tiles, downstairs living room water seepage repainted.

10 answers2024-05-02

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

3 answers2024-05-02

Before the wall tiles are pasted, quickly treat the waterproofing facilities before laying the underfloor heating and water pipes.

4 answers2024-05-02

In order to prevent the water flow of the toilet into the room, the toilet is lower than the indoor position; The bathroom will destroy the waterproofing made by the developer when the house is renovated in the later stage, and the quality of the materials used in the waterproofing made by the developer will not be very good. >>>More

1 answers2024-05-02

It's okay, just ask the decoration company to do it again when the time comes, and you generally have to do it again.